X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505213508002

Well Details

Well ID: 0505213508002
Loading map...
Location: 00/08-35-050-21W5/2
Location Alias: 00/08-35-50-21 W5M
Location Alias 2: 00/08-35-050-21 W5/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 21
Section: 35
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ BANSHEE 8-35-50-21
Operator Name: Tourmaline Oil Corp.
License Number: 0457896
License Date: 2013-07-08
License Status: Amended
Spud Date: 2013-09-06
Final Drill Date: 2013-10-06
Well Total Depth: 4973.00 m
Surface Hole Latitude: 53.350672
Surface Hole Longitude: -116.927220

For data sources see[1][2]

Well History

Date Event
2013-07-08 Obtained License
2013-09-08 Surface Casing Operation Performed
2013-09-14 Intermediate Casing Operation Performed
2013-09-24 Direction Drilling Operation Performed - Horizontal
2013-09-24 Direction Drilling Operation Performed - Sidetrack Fish
2013-10-06 Finished Drilling
2013-10-06 Well Log Performed
2013-10-06 Well Mode changed to Drilled and Cased
2013-10-10 Production Casing Operation Performed
2013-10-11 Rig Released
2013-10-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2013-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-09 Well Began Production
2014-01-09 Well Fluid changed to Gas
2014-01-09 Well Mode changed to Flowing
2015-12-17 Well Fluid changed to Gas
2015-12-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-09-24 2859.00 Sidetrack fish
2013-09-24 2859.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-10-17 Hydra Jet Perforation 4903.50 4903.60 0
2013-10-19 Multi-Stage Fracture 4390.40 4390.50 0
2013-10-19 Multi-Stage Fracture 4324.20 4324.30 0
2013-10-19 Multi-Stage Fracture 4259.00 4259.10 0
2013-10-19 Multi-Stage Fracture 4193.30 4193.40 0
2013-10-19 Multi-Stage Fracture 4127.30 4127.40 0
2013-10-19 Multi-Stage Fracture 4061.30 4061.40 0
2013-10-19 Multi-Stage Fracture 3995.40 3995.50 0
2013-10-19 Multi-Stage Fracture 3930.00 3930.10 0
2013-10-19 Multi-Stage Fracture 3864.40 3864.50 0
2013-10-19 Multi-Stage Fracture 3798.60 3798.70 0
2013-10-17 Acid Treatment 4903.50 4903.60 0
2013-10-19 Multi-Stage Fracture 3732.40 3732.50 0
2013-10-19 Multi-Stage Fracture 3667.00 3667.10 0
2013-10-19 Multi-Stage Fracture 3601.10 3601.20 0
2013-10-19 Multi-Stage Fracture 3534.40 3534.50 0
2013-10-20 Multi-Stage Fracture 3469.10 3469.20 0
2013-10-20 Multi-Stage Fracture 3415.70 3415.80 0
2013-10-20 Multi-Stage Fracture 3374.70 3374.80 0
2013-10-18 Multi-Stage Fracture 4849.60 4849.70 0
2013-10-18 Multi-Stage Fracture 4783.80 4783.90 0
2013-10-18 Multi-Stage Fracture 4717.60 4717.70 0
2013-10-18 Multi-Stage Fracture 4651.60 4651.70 0
2013-10-18 Multi-Stage Fracture 4586.30 4586.40 0
2013-10-18 Multi-Stage Fracture 4520.70 4520.80 0
2013-10-19 Multi-Stage Fracture 4455.20 4455.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-18 2013-10-20 3,185 6,655 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 85.0877 N/A
Prime Plus (40/70) Trican hexamethylenetetramine 100-97-0 100 5.3271 N/A
silica crystalline 14808-60-7 100 5.3271 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 7.764 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 1.4647 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0106 N/A
dibromoacetonitrile 3252-43-5 100 0.0106 N/A
non-hazardous ingredients Not Available 100 0.0106 N/A
polyethylene glycol 25322-68-3 100 0.0106 N/A
sodium bromide 7647-15-6 100 0.0106 N/A
CC-77 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.187 N/A
non-hazardous ingredients Not Available 100 0.187 N/A
FR-9 Trican Friction Reducer distillates (petroleum). hydrotreated light 64742-47-8 100 0.0884 N/A
non-hazardous ingredients Not Available 100 0.0884 N/A
S- 2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0701 N/A
isopropanol 67-63-0 100 0.0701 N/A
methanol 67-56-1 100 0.0701 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0701 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0701 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-10-17 2013-10-19 Surface Water - River 4104
2013-10-16 2013-10-16 Surface Water - River 782
2013-10-15 2013-10-15 Municipal Water 90
2013-10-15 2013-10-15 Recycled Fracturing Water (treated at well site) 900
2013-10-15 2013-10-15 Recycled Fracturing Water (treated at well site) 779

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 8220 0.0 0.0 0.0
2015 8435 0.0 0.0 0.0
2016 8688 0.0 0.0 0.0
2017 8668 0.0 0.0 0.0
2018 8508 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-06 No Incident Encountered 0.00 0.00
2013-10-15 No Incident Encountered 0.00 0.00

For data sources see[9]

References