X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505210212000

Well Details

Well ID: 0505210212000
Loading map...
Location: 00/12-02-050-21W5/0
Location Alias: 00/12-02-50-21 W5M
Location Alias 2: 00/12-02-050-21 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 21
Section: 02
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ BASING 12-2-50-21
Operator Name: Tourmaline Oil Corp.
License Number: 0474617
License Date: 2015-02-13
License Status: Issued
Spud Date: 2015-06-17
Final Drill Date: 2015-07-12
Well Total Depth: 5145.00 m
Surface Hole Latitude: 53.298645
Surface Hole Longitude: -116.993043

For data sources see[1][2]

Well History

Date Event
2015-02-13 Obtained License
2015-06-17 Lost Circulation Occurred
2015-06-19 Surface Casing Operation Performed
2015-06-24 Well Log Performed
2015-06-25 Intermediate Casing Operation Performed
2015-06-29 Direction Drilling Operation Performed - Deviate
2015-07-03 Direction Drilling Operation Performed - Horizontal
2015-07-12 Finished Drilling
2015-07-12 Well Mode changed to Drilled and Cased
2015-07-13 Well Log Performed
2015-07-16 Well Log Performed
2015-07-17 Production Casing Operation Performed
2015-07-17 Rig Released
2015-07-26 Well Log Performed
2015-07-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-31 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-02 Well Began Production
2015-08-02 Well Fluid changed to Gas
2015-08-02 Well Mode changed to Flowing
2017-06-14 Well Fluid changed to Gas
2017-06-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-06-17 Patterson-UTI Drilling Co. Canada 14E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-06-29 3108.60 Deviate (5 - 79 degrees)
2015-07-03 3541.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-07-27 Multi-Stage Fracture 5093.10 5093.20 0
2015-07-30 Multi-Stage Fracture 4500.40 4500.50 0
2015-07-30 Multi-Stage Fracture 4434.50 4434.60 0
2015-07-31 Multi-Stage Fracture 4369.00 4369.10 0
2015-07-31 Multi-Stage Fracture 4303.20 4303.30 0
2015-07-31 Multi-Stage Fracture 4237.30 4237.40 0
2015-07-31 Multi-Stage Fracture 4171.60 4171.70 0
2015-07-31 Multi-Stage Fracture 4105.90 4106.00 0
2015-07-31 Multi-Stage Fracture 4052.80 4052.90 0
2015-07-31 Multi-Stage Fracture 3999.90 4000.00 0
2015-07-31 Multi-Stage Fracture 3946.70 3946.80 0
2015-07-30 Multi-Stage Fracture 5024.30 5024.40 0
2015-07-31 Multi-Stage Fracture 3893.70 3893.80 0
2015-07-31 Multi-Stage Fracture 3841.00 3841.10 0
2015-07-31 Multi-Stage Fracture 3787.80 3787.90 0
2015-07-31 Multi-Stage Fracture 3734.60 3734.70 0
2015-08-01 Multi-Stage Fracture 3681.40 3681.50 0
2015-08-01 Multi-Stage Fracture 3628.30 3628.40 0
2015-08-01 Multi-Stage Fracture 3588.00 3588.10 0
2015-07-30 Multi-Stage Fracture 4958.60 4958.70 0
2015-07-30 Multi-Stage Fracture 4893.70 4893.80 0
2015-07-30 Multi-Stage Fracture 4827.90 4828.00 0
2015-07-30 Multi-Stage Fracture 4763.20 4763.30 0
2015-07-30 Multi-Stage Fracture 4697.30 4697.40 0
2015-07-30 Multi-Stage Fracture 4631.90 4632.00 0
2015-07-30 Multi-Stage Fracture 4566.10 4566.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-27 2015-08-01 3,412 5,886 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 88.7075 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.1495 N/A
silica crystalline 14808-60-7 100 3.1495 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 9.7633 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7335 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0122 N/A
dibromoacetonitrile 3252-43-5 100 0.0122 N/A
non-hazardous ingredients Not Available 100 0.0122 N/A
polyethylene glycol 25322-68-3 100 0.0122 N/A
sodium bromide 7647-15-6 100 0.0122 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1951 N/A
water Not Available 100 0.1951 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0946 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0946 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0946 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0946 N/A
non-hazardous ingredients Not Available 100 0.0946 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.075 N/A
isopropanol 67-63-0 100 0.075 N/A
methanol 67-56-1 100 0.075 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.075 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.075 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-29 2015-07-29 Recycled Fracturing Water (treated at well site) 450
2015-07-29 2015-07-29 Recycled Fracturing Water (treated at well site) 2544
2015-07-27 2015-07-31 Surface Water - River 2892

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3421 0.0 0.0 0.0
2016 8226 0.0 0.0 0.0
2017 7606 0.0 0.0 0.0
2018 8363 0.0 0.0 0.0
2019 8756 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-17 Lost Circulation 70.00 85.00
2015-08-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References