X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505201313020

Well Details

Well ID: 0505201313020
Loading map...
Location: 02/13-13-050-20W5/0
Location Alias: 02/13-13-50-20 W5M
Location Alias 2: 02/13-13-050-20 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 20
Section: 13
County/Municipality: Yellowhead County
Well Name: TOURMALINE 102 HZ ANSELL 13-13-50-20
Operator Name: Tourmaline Oil Corp.
License Number: 0484756
License Date: 2017-07-28
License Status: Amended
Spud Date: 2018-09-02
Final Drill Date: 2018-10-19
Well Total Depth: 4228.00 m
Surface Hole Latitude: 53.310676
Surface Hole Longitude: -116.795247

For data sources see[1][2]

Well History

Date Event
2017-07-28 Obtained License
2018-09-03 Surface Casing Operation Performed
2018-10-14 Intermediate Casing Operation Performed
2018-10-15 Direction Drilling Operation Performed - Deviate
2018-10-17 Direction Drilling Operation Performed - Horizontal
2018-10-19 Finished Drilling
2018-10-19 Well Mode changed to Drilled and Cased
2018-10-20 Well Log Performed
2018-10-21 Production Casing Operation Performed
2018-10-21 Rig Released
2018-11-09 Well Began Production
2018-11-09 Well Fluid changed to Gas
2018-11-09 Well Mode changed to Flowing
2018-11-13 Well Log Performed
2018-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-05 Well Fluid changed to Gas
2019-12-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-09-02 Nabors Drilling Canada Limited 77 N/A Set Surface
2018-10-15 Nabors Drilling Limited 77E N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-10-15 2696.70 Deviate (5 - 79 degrees)
2018-10-17 3128.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-11-24 Multi-Stage Fracture 4175.70 4175.80 0
2018-11-25 Multi-Stage Fracture 3710.30 3710.40 0
2018-11-25 Multi-Stage Fracture 3657.30 3657.40 0
2018-11-25 Multi-Stage Fracture 3604.40 3604.50 0
2018-11-25 Multi-Stage Fracture 3551.40 3551.50 0
2018-11-25 Multi-Stage Fracture 3498.50 3498.60 0
2018-11-25 Multi-Stage Fracture 3445.50 3445.60 0
2018-11-25 Multi-Stage Fracture 3392.60 3392.70 0
2018-11-25 Multi-Stage Fracture 3340.70 3340.80 0
2018-11-25 Multi-Stage Fracture 3287.70 3287.80 0
2018-11-25 Multi-Stage Fracture 3234.80 3234.90 0
2018-11-24 Multi-Stage Fracture 4133.90 4134.00 0
2018-11-25 Multi-Stage Fracture 3182.40 3182.50 0
2018-11-24 Multi-Stage Fracture 4081.00 4081.10 0
2018-11-25 Multi-Stage Fracture 4028.00 4028.10 0
2018-11-25 Multi-Stage Fracture 3975.10 3975.20 0
2018-11-25 Multi-Stage Fracture 3922.10 3922.20 0
2018-11-25 Multi-Stage Fracture 3869.20 3869.30 0
2018-11-25 Multi-Stage Fracture 3816.20 3816.30 0
2018-11-25 Multi-Stage Fracture 3763.20 3763.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-24 2018-11-25 2,988 4,567 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.3088 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.6989 N/A
silica crystalline 14808-60-7 100 3.6989 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.9661 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8494 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0083 N/A
dibromoacetonitrile 3252-43-5 100 0.0083 N/A
non-hazardous ingredients Not Available 100 0.0083 N/A
polyethylene glycol 25322-68-3 100 0.0083 N/A
sodium bromide 7647-15-6 100 0.0083 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0818 N/A
water Not Available 100 0.0818 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.047 N/A
non-hazardous ingredients Not Available 100 0.047 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0393 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0393 N/A
methanol 67-56-1 100 0.0393 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0393 N/A
non-hazardous ingredients Not Available 100 0.0393 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-11-24 2018-11-26 Surface Water - Lake 543
2018-11-05 2018-11-23 Oilfield Produced Water 3634
2018-11-24 2018-11-24 Recycled Fracturing Water (treated at well site) 390

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 759 0.0 0.0 0.0
2019 8724 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-19 No Incident Encountered 0.00 0.00
2018-12-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References