X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505200604000

Well Details

Well ID: 0505200604000
Loading map...
Location: 00/04-06-050-20W5/0
Location Alias: 00/04-06-50-20 W5M
Location Alias 2: 00/04-06-050-20 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 20
Section: 06
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ MINEHEAD 4-6-50-20
Operator Name: Tourmaline Oil Corp.
License Number: 0475738
License Date: 2015-06-09
License Status: Issued
Spud Date: 2015-07-24
Final Drill Date: 2015-08-24
Well Total Depth: 5077.00 m
Surface Hole Latitude: 53.270536
Surface Hole Longitude: -116.908505

For data sources see[1][2]

Well History

Date Event
2015-06-09 Obtained License
2015-07-26 Surface Casing Operation Performed
2015-07-31 Well Log Performed
2015-08-02 Intermediate Casing Operation Performed
2015-08-06 Direction Drilling Operation Performed - Deviate
2015-08-13 Direction Drilling Operation Performed - Horizontal
2015-08-14 Well Log Performed
2015-08-17 Lost Circulation Occurred
2015-08-22 Lost Circulation Occurred
2015-08-24 Finished Drilling
2015-08-24 Well Log Performed
2015-08-24 Well Mode changed to Drilled and Cased
2015-08-26 Lost Circulation Occurred
2015-09-02 Production Casing Operation Performed
2015-09-02 Rig Released
2015-10-24 Well Log Performed
2015-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-01 Well Began Production
2015-11-01 Well Fluid changed to Gas
2015-11-01 Well Mode changed to Flowing
2019-05-18 Well Fluid changed to Gas
2019-05-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-24 Precision Drilling Corporation 463 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-06 2991.90 Deviate (5 - 79 degrees)
2015-08-13 3630.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-10-26 Multi-Stage Fracture 5028.00 5028.10 0
2015-10-30 Multi-Stage Fracture 4611.10 4611.20 0
2015-10-30 Multi-Stage Fracture 4558.30 4558.40 0
2015-10-30 Multi-Stage Fracture 4505.10 4505.20 0
2015-10-30 Multi-Stage Fracture 4452.60 4452.70 0
2015-10-30 Multi-Stage Fracture 4399.40 4399.50 0
2015-10-30 Multi-Stage Fracture 4346.30 4346.40 0
2015-10-30 Multi-Stage Fracture 4293.20 4293.30 0
2015-10-30 Multi-Stage Fracture 4240.10 4240.20 0
2015-10-30 Multi-Stage Fracture 4187.00 4187.10 0
2015-10-30 Multi-Stage Fracture 4133.90 4134.00 0
2015-10-28 Acid Treatment 5028.00 5028.10 0
2015-10-30 Multi-Stage Fracture 4080.80 4080.90 0
2015-10-31 Multi-Stage Fracture 4015.00 4015.10 0
2015-10-31 Multi-Stage Fracture 3949.20 3949.30 0
2015-10-31 Multi-Stage Fracture 3883.40 3883.50 0
2015-10-31 Multi-Stage Fracture 3817.70 3817.80 0
2015-10-31 Multi-Stage Fracture 3751.90 3752.00 0
2015-10-31 Multi-Stage Fracture 3686.10 3686.20 0
2015-10-31 Multi-Stage Fracture 3620.30 3620.40 0
2015-10-29 Multi-Stage Fracture 4982.90 4983.00 0
2015-10-29 Multi-Stage Fracture 4929.80 4929.90 0
2015-10-29 Multi-Stage Fracture 4876.70 4876.80 0
2015-10-29 Multi-Stage Fracture 4823.50 4823.60 0
2015-10-30 Multi-Stage Fracture 4770.40 4770.50 0
2015-10-30 Multi-Stage Fracture 4717.30 4717.40 0
2015-10-30 Multi-Stage Fracture 4664.20 4664.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-26 2015-10-31 3,398 7,063 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.8881 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.9992 N/A
silica crystalline 14808-60-7 100 3.9992 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 9.3258 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.5865 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
polyethylene glycol 25322-68-3 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1854 N/A
formic acid 64-18-6 100 0.1854 N/A
non-hazardous ingredients Not Available 100 0.1854 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.088 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.088 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.088 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.088 N/A
non-hazardous ingredients Not Available 100 0.088 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0698 N/A
isopropanol 67-63-0 100 0.0698 N/A
methanol 67-56-1 100 0.0698 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0698 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0698 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-10-17 2015-10-30 Recycled Fracturing Water (treated at well site) 1177
2015-10-23 2015-10-23 Recycled Fracturing Water (treated at well site) 121
2015-10-24 2015-11-01 Recycled Fracturing Water (treated at well site) 1406
2015-10-30 2015-11-02 Recycled Fracturing Water (treated at well site) 1406
2015-10-30 2015-10-30 Recycled Fracturing Water (treated at well site) 92
2015-10-30 2015-11-02 Surface Water - River 2660
2015-10-29 2015-10-31 Recycled Fracturing Water (treated at well site) 201

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1184 0.0 0.0 0.0
2016 8341 0.0 0.0 0.0
2017 6824 0.0 0.0 0.0
2018 8071 0.0 0.0 0.0
2019 8465 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-17 Lost Circulation 4191.00 4669.00
2015-08-22 Lost Circulation 4834.00 5077.00
2015-08-26 Lost Circulation 5077.00 5077.00
2015-11-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References