X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505200112000

Well Details

Well ID: 0505200112000
Loading map...
Location: 00/12-01-050-20W5/0
Location Alias: 00/12-01-50-20 W5M
Location Alias 2: 00/12-01-050-20 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 20
Section: 01
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ ANSELL 12-1-50-20
Operator Name: Tourmaline Oil Corp.
License Number: 0479905
License Date: 2016-07-18
License Status: Amended
Spud Date: 2016-11-29
Final Drill Date: 2017-01-31
Well Total Depth: 4634.00 m
Surface Hole Latitude: 53.281821
Surface Hole Longitude: -116.781072

For data sources see[1][2]

Well History

Date Event
2016-07-18 Obtained License
2016-11-29 Direction Drilling Operation Performed - Deviate
2016-11-30 Surface Casing Operation Performed
2016-12-05 Intermediate Casing Operation Performed
2017-01-27 Direction Drilling Operation Performed - Horizontal
2017-01-28 Well Log Performed
2017-01-31 Finished Drilling
2017-01-31 Well Log Performed
2017-01-31 Well Mode changed to Drilled and Cased
2017-02-01 Well Log Performed
2017-02-04 Production Casing Operation Performed
2017-02-05 Rig Released
2017-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-22 Well Began Production
2017-02-22 Well Fluid changed to Gas
2017-02-22 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-11-29 212.80 Deviate (5 - 79 degrees)
2017-01-27 3130.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-12 Multi-Stage Fracture 4187.00 4187.10 0
2017-02-21 Multi-Stage Fracture 3842.20 3842.30 0
2017-02-21 Multi-Stage Fracture 3802.40 3802.50 0
2017-02-21 Multi-Stage Fracture 3763.00 3763.10 0
2017-02-21 Multi-Stage Fracture 3723.60 3723.70 0
2017-02-21 Multi-Stage Fracture 3684.10 3684.20 0
2017-02-21 Multi-Stage Fracture 3644.30 3644.40 0
2017-02-21 Multi-Stage Fracture 3604.70 3604.80 0
2017-02-21 Multi-Stage Fracture 3414.70 3414.80 0
2017-02-21 Multi-Stage Fracture 3375.30 3375.40 0
2017-02-21 Multi-Stage Fracture 3335.80 3335.90 0
2017-02-20 Multi-Stage Fracture 4158.10 4158.20 0
2017-02-21 Multi-Stage Fracture 3296.40 3296.50 0
2017-02-21 Multi-Stage Fracture 3257.00 3257.10 0
2017-02-21 Multi-Stage Fracture 3217.50 3217.60 0
2017-02-21 Multi-Stage Fracture 3178.00 3178.10 0
2017-02-21 Multi-Stage Fracture 3150.50 3150.60 0
2017-02-20 Multi-Stage Fracture 4118.80 4118.90 0
2017-02-20 Multi-Stage Fracture 4079.30 4079.40 0
2017-02-20 Multi-Stage Fracture 4039.90 4040.00 0
2017-02-20 Multi-Stage Fracture 4000.40 4000.50 0
2017-02-20 Multi-Stage Fracture 3961.00 3961.10 0
2017-02-21 Multi-Stage Fracture 3921.20 3921.30 0
2017-02-21 Multi-Stage Fracture 3881.70 3881.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-12 2017-02-21 3,009 4,561 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 81.8902 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.5788 N/A
silica crystalline 14808-60-7 100 4.5788 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 12.5184 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.7847 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0108 N/A
2-mercaptoethanol 60-24-2 100 0.0108 N/A
dibromoacetonitrile 3252-43-5 100 0.0109 N/A
non-hazardous ingredients Not Available 100 0.0108 N/A
sodium bromide 7647-15-6 100 0.0108 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0879 N/A
water Not Available 100 0.0879 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0869 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0869 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0869 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0869 N/A
non-hazardous ingredients Not Available 100 0.0869 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0418 N/A
methanol 67-56-1 100 0.0418 N/A
water Not Available 100 0.0418 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 7232 0.0 0.0 0.0
2018 8527 0.0 0.0 0.0
2019 8627 0.0 0.0 0.0
2020 2114 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-31 No Incident Encountered 0.00 0.00
2017-03-08 No Incident Encountered 0.00 0.00

For data sources see[8]

References