X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505192004020

Well Details

Well ID: 0505192004020
Loading map...
Location: 02/04-20-050-19W5/0
Location Alias: 02/04-20-50-19 W5M
Location Alias 2: 02/04-20-050-19 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 19
Section: 20
County/Municipality: Yellowhead County
Well Name: TOURMALINE 102 HZ ANSELL 4-20-50-19
Operator Name: Tourmaline Oil Corp.
License Number: 0482539
License Date: 2017-01-23
License Status: Issued
Spud Date: 2017-10-01
Final Drill Date: 2017-11-22
Well Total Depth: 4817.00 m
Surface Hole Latitude: 53.309990
Surface Hole Longitude: -116.740103

For data sources see[1][2]

Well History

Date Event
2017-01-23 Obtained License
2017-10-03 Surface Casing Operation Performed
2017-11-14 Intermediate Casing Operation Performed
2017-11-15 Direction Drilling Operation Performed - Deviate
2017-11-16 Direction Drilling Operation Performed - Horizontal
2017-11-22 Finished Drilling
2017-11-22 Well Log Performed
2017-11-22 Well Mode changed to Drilled and Cased
2017-11-23 Production Casing Operation Performed
2017-11-24 Rig Released
2017-12-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-09 Well Began Production
2017-12-09 Well Fluid changed to Gas
2017-12-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-10-01 Patterson-UTI Drilling Co. Canada 15 N/A Set Surface
2017-11-10 Patterson-UTI Drilling Co. Canada 15E N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-15 2697.00 Deviate (5 - 79 degrees)
2017-11-16 3149.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-03 Multi-Stage Fracture 4754.40 4754.50 0
2017-12-08 Multi-Stage Fracture 4294.00 4294.10 0
2017-12-08 Multi-Stage Fracture 4241.90 4242.00 0
2017-12-08 Multi-Stage Fracture 4189.40 4189.50 0
2017-12-08 Multi-Stage Fracture 4137.40 4137.50 0
2017-12-08 Multi-Stage Fracture 4084.90 4085.00 0
2017-12-08 Multi-Stage Fracture 4032.40 4032.50 0
2017-12-08 Multi-Stage Fracture 3979.90 3980.00 0
2017-12-08 Multi-Stage Fracture 3927.40 3927.50 0
2017-12-08 Multi-Stage Fracture 3874.90 3875.00 0
2017-12-08 Multi-Stage Fracture 3822.40 3822.50 0
2017-12-07 Multi-Stage Fracture 4713.00 4713.10 0
2017-12-08 Multi-Stage Fracture 3769.80 3769.90 0
2017-12-08 Multi-Stage Fracture 3717.30 3717.40 0
2017-12-08 Multi-Stage Fracture 3664.90 3665.00 0
2017-12-08 Multi-Stage Fracture 3612.40 3612.50 0
2017-12-08 Multi-Stage Fracture 3561.10 3561.20 0
2017-12-08 Multi-Stage Fracture 3459.20 3459.30 0
2017-12-08 Multi-Stage Fracture 3406.70 3406.80 0
2017-12-08 Multi-Stage Fracture 3354.20 3354.30 0
2017-12-08 Multi-Stage Fracture 3301.60 3301.70 0
2017-12-08 Multi-Stage Fracture 3249.10 3249.20 0
2017-12-07 Multi-Stage Fracture 4660.50 4660.60 0
2017-12-08 Multi-Stage Fracture 3209.30 3209.40 0
2017-12-08 Multi-Stage Fracture 4608.00 4608.10 0
2017-12-08 Multi-Stage Fracture 4555.50 4555.60 0
2017-12-08 Multi-Stage Fracture 4503.30 4503.40 0
2017-12-08 Multi-Stage Fracture 4450.70 4450.80 0
2017-12-08 Multi-Stage Fracture 4398.20 4398.30 0
2017-12-08 Multi-Stage Fracture 4345.70 4345.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-03 2017-12-08 3,017 6,774 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.7458 N/A
Prime Plus (40/70) Trican Technical Services No specific ingredients Not Available 100 3.7659 N/A
Sand - Tier 1 (40/70) Trican Technical Services Aluminum Oxide 1344-28-1 100 11.4028 N/A
Crystalline silica. quartz 14808-60-7 100 11.4028 N/A
Iron Oxide 1309-37-1 100 11.4028 N/A
Titanium Oxide 13463-67-7 100 11.4028 N/A
Sand - Tier 1 (50/140) Trican Technical Services Aluminum Oxide 1344-28-1 100 1.8829 N/A
Crystalline silica. quartz 14808-60-7 100 1.8829 N/A
Iron Oxide 1309-37-1 100 1.8829 N/A
Titanium Oxide 13463-67-7 100 1.883 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0109 N/A
2-mercaptoethanol 60-24-2 100 0.0109 N/A
dibromoacetonitrile 3252-43-5 100 0.0108 N/A
non-hazardous ingredients Not Available 100 0.0109 N/A
sodium bromide 7647-15-6 100 0.0109 N/A
CC-7 (Clay Stabilizer) Trican Well Service Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0956 N/A
water Not Available 100 0.0956 N/A
FR-22 (Friction Reducer) Trican Well Service Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0518 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0517 N/A
non-hazardous ingredients Not Available 100 0.0517 N/A
S-17X (Surfactant) Trican Well Service Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.044 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.044 N/A
methanol 67-56-1 100 0.044 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.044 N/A
non-hazardous ingredients Not Available 100 0.044 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-11-29 2017-12-30 Recycled Fracturing Water (treated at well site) 224
2017-11-28 2017-11-28 Recycled Fracturing Water (treated at well site) 369
2017-12-05 2017-12-08 Recycled Fracturing Water (treated at well site) 1008
2017-12-05 2017-12-08 Recycled Fracturing Water (treated at well site) 1314
2017-12-05 2017-12-08 Recycled Fracturing Water (treated at well site) 1181
2017-12-05 2017-12-08 Recycled Fracturing Water (treated at well site) 1528
2017-12-05 2017-12-08 Recycled Fracturing Water (treated at well site) 919
2017-12-05 2017-12-08 Oilfield Produced Water 230

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 382 0.0 0.0 0.0
2018 8733 0.0 0.0 0.0
2019 8725 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-22 No Incident Encountered 0.00 0.00
2017-12-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References