If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505191613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.310021,"lon":-116.740159,"icon":""}]} |
Location: 00/13-16-050-19W5/0 | |
Location Alias: 00/13-16-50-19 W5M | |
Location Alias 2: 00/13-16-050-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 19 | |
Section: 16 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE HZ ANSELL 13-16-50-19 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0482540 | |
License Date: 2017-01-23 | |
License Status: Issued | |
Spud Date: 2017-10-03 | |
Final Drill Date: 2017-10-23 | |
Well Total Depth: 4855.00 m | |
Surface Hole Latitude: 53.310021 | |
Surface Hole Longitude: -116.740159 |
Date | Event |
---|---|
2017-01-23 | Obtained License |
2017-10-04 | Surface Casing Operation Performed |
2017-10-11 | Direction Drilling Operation Performed - Deviate |
2017-10-11 | Intermediate Casing Operation Performed |
2017-10-15 | Direction Drilling Operation Performed - Horizontal |
2017-10-15 | Well Log Performed |
2017-10-16 | Well Log Performed |
2017-10-23 | Finished Drilling |
2017-10-23 | Well Log Performed |
2017-10-23 | Well Mode changed to Drilled and Cased |
2017-10-25 | Production Casing Operation Performed |
2017-10-26 | Rig Released |
2017-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-11 | Well Began Production |
2017-12-11 | Well Fluid changed to Gas |
2017-12-11 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-10-03 | Patterson-UTI Drilling Co. Canada | 15E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-10-11 | 2740.20 | Deviate (5 - 79 degrees) |
2017-10-15 | 3288.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-12-03 | Multi-Stage Fracture | 4799.10 | 4799.20 | 0 |
2017-12-06 | Multi-Stage Fracture | 4334.90 | 4335.00 | 0 |
2017-12-06 | Multi-Stage Fracture | 4282.20 | 4282.30 | 0 |
2017-12-06 | Multi-Stage Fracture | 4229.30 | 4229.40 | 0 |
2017-12-06 | Multi-Stage Fracture | 4176.40 | 4176.50 | 0 |
2017-12-06 | Multi-Stage Fracture | 4123.80 | 4123.90 | 0 |
2017-12-06 | Multi-Stage Fracture | 4070.90 | 4071.00 | 0 |
2017-12-07 | Multi-Stage Fracture | 4018.40 | 4018.50 | 0 |
2017-12-07 | Multi-Stage Fracture | 3966.00 | 3966.10 | 0 |
2017-12-07 | Multi-Stage Fracture | 3913.10 | 3913.20 | 0 |
2017-12-07 | Multi-Stage Fracture | 3860.20 | 3860.30 | 0 |
2017-12-06 | Multi-Stage Fracture | 4757.30 | 4757.40 | 0 |
2017-12-07 | Multi-Stage Fracture | 3807.30 | 3807.40 | 0 |
2017-12-07 | Multi-Stage Fracture | 3754.90 | 3755.00 | 0 |
2017-12-07 | Multi-Stage Fracture | 3702.00 | 3702.10 | 0 |
2017-12-07 | Multi-Stage Fracture | 3649.20 | 3649.30 | 0 |
2017-12-07 | Multi-Stage Fracture | 3596.40 | 3596.50 | 0 |
2017-12-07 | Multi-Stage Fracture | 3543.90 | 3544.00 | 0 |
2017-12-07 | Multi-Stage Fracture | 3491.00 | 3491.10 | 0 |
2017-12-07 | Multi-Stage Fracture | 3438.20 | 3438.30 | 0 |
2017-12-07 | Multi-Stage Fracture | 3385.40 | 3385.50 | 0 |
2017-12-07 | Multi-Stage Fracture | 3332.80 | 3332.90 | 0 |
2017-12-06 | Multi-Stage Fracture | 4704.40 | 4704.50 | 0 |
2017-12-06 | Multi-Stage Fracture | 4651.50 | 4651.60 | 0 |
2017-12-06 | Multi-Stage Fracture | 4598.50 | 4598.60 | 0 |
2017-12-06 | Multi-Stage Fracture | 4545.60 | 4545.70 | 0 |
2017-12-06 | Multi-Stage Fracture | 4492.70 | 4492.80 | 0 |
2017-12-06 | Multi-Stage Fracture | 4440.70 | 4440.80 | 0 |
2017-12-06 | Multi-Stage Fracture | 4387.80 | 4387.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-12-03 | 2017-12-07 | 3,144 | 6,643 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 83.2647 | N/A | |||
Prime Plus (40/70) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 3.6961 | N/A | ||
Sand - Tier 1 (40/70) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 10.9972 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 10.9972 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 10.9972 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 10.9971 | N/A | ||||
Sand - Tier 1 (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.848 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.848 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.848 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.8481 | N/A | ||||
AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0104 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0104 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0104 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0104 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0104 | N/A | ||||
CC-7 (Clay Stabilizer) | Trican Well Service | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0925 | N/A | |
water | Not Available | 100 | 0.0925 | N/A | ||||
FR-22 (Friction Reducer) | Trican Well Service | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0493 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0493 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0493 | N/A | ||||
S-17X (Surfactant) | Trican Well Service | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0415 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0415 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0415 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0415 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0415 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-12-05 | 2017-12-08 | Oilfield Produced Water | 5083 |
2017-11-29 | 2017-11-30 | Recycled Fracturing Water (treated at well site) | 991 |
2017-11-29 | 2017-11-30 | Recycled Fracturing Water (treated at well site) | 568 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 442 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 6804 | 0.0 | 0.0 | 0.0 |
2020 | 1425 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-10-23 | No Incident Encountered | 0.00 | 0.00 |
2017-12-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]