X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505183214000

Well Details

Well ID: 0505183214000
Loading map...
Location: 00/14-32-050-18W5/0
Location Alias: 00/14-32-50-18 W5M
Location Alias 2: 00/14-32-050-18 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 18
Section: 32
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ EDSON 14-32-50-18
Operator Name: Tourmaline Oil Corp.
License Number: 0483557
License Date: 2017-05-09
License Status: Issued
Spud Date: 2017-11-29
Final Drill Date: 2018-01-14
Well Total Depth: 4448.00 m
Surface Hole Latitude: 53.350887
Surface Hole Longitude: -116.589247

For data sources see[1][2]

Well History

Date Event
2017-05-09 Obtained License
2017-11-30 Surface Casing Operation Performed
2018-01-07 Direction Drilling Operation Performed - Deviate
2018-01-08 Well Log Performed
2018-01-10 Intermediate Casing Operation Performed
2018-01-11 Direction Drilling Operation Performed - Horizontal
2018-01-14 Finished Drilling
2018-01-14 Well Log Performed
2018-01-14 Well Mode changed to Drilled and Cased
2018-01-15 Liner Casing Operation Performed
2018-01-16 Rig Released
2018-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-16 Well Began Production
2018-02-16 Well Fluid changed to Gas
2018-02-16 Well Mode changed to Flowing
2018-12-10 Well Fluid changed to Gas
2018-12-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-29 Patterson-UTI Drilling Co. Canada 15E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-07 2524.60 Deviate (5 - 79 degrees)
2018-01-11 2905.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-06 Multi-Stage Fracture 4420.90 4421.00 0
2018-02-12 Multi-Stage Fracture 3970.50 3970.60 0
2018-02-12 Multi-Stage Fracture 3918.50 3918.60 0
2018-02-13 Multi-Stage Fracture 3866.70 3866.80 0
2018-02-13 Multi-Stage Fracture 3815.20 3815.30 0
2018-02-13 Multi-Stage Fracture 3763.20 3763.30 0
2018-02-13 Multi-Stage Fracture 3711.20 3711.30 0
2018-02-13 Multi-Stage Fracture 3659.20 3659.30 0
2018-02-13 Multi-Stage Fracture 3607.50 3607.60 0
2018-02-13 Multi-Stage Fracture 3555.50 3555.60 0
2018-02-13 Multi-Stage Fracture 3503.50 3503.60 0
2018-02-12 Multi-Stage Fracture 4382.80 4382.90 0
2018-02-13 Multi-Stage Fracture 3451.50 3451.60 0
2018-02-13 Multi-Stage Fracture 3399.50 3399.60 0
2018-02-13 Multi-Stage Fracture 3347.50 3347.60 0
2018-02-13 Multi-Stage Fracture 3295.60 3295.70 0
2018-02-13 Multi-Stage Fracture 3243.60 3243.70 0
2018-02-13 Multi-Stage Fracture 3192.00 3192.10 0
2018-02-13 Multi-Stage Fracture 3127.80 3127.90 0
2018-02-13 Multi-Stage Fracture 3075.80 3075.90 0
2018-02-13 Multi-Stage Fracture 3023.80 3023.90 0
2018-02-13 Multi-Stage Fracture 2971.90 2972.00 0
2018-02-12 Multi-Stage Fracture 4331.90 4332.00 0
2018-02-13 Multi-Stage Fracture 2920.00 2920.10 0
2018-02-12 Multi-Stage Fracture 4280.00 4280.10 0
2018-02-12 Multi-Stage Fracture 4228.30 4228.40 0
2018-02-12 Multi-Stage Fracture 4176.30 4176.40 0
2018-02-12 Multi-Stage Fracture 4124.80 4124.90 0
2018-02-12 Multi-Stage Fracture 4073.60 4073.70 0
2018-02-12 Multi-Stage Fracture 4021.70 4021.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-06 2018-02-13 2,766 7,173 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.7489 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.7065 N/A
silica crystalline 14808-60-7 100 3.7065 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.5641 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7872 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.013 N/A
dibromoacetonitrile 3252-43-5 100 0.013 N/A
non-hazardous ingredients Not Available 100 0.013 N/A
polyethylene glycol 25322-68-3 100 0.013 N/A
sodium bromide 7647-15-6 100 0.013 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0897 N/A
water Not Available 100 0.0897 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.048 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.048 N/A
non-hazardous ingredients Not Available 100 0.048 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0422 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0422 N/A
methanol 67-56-1 100 0.0422 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0422 N/A
non-hazardous ingredients Not Available 100 0.0422 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-05 2018-02-12 Recycled Fracturing Water (treated at well site) 3489
2018-02-04 2018-02-06 Recycled Fracturing Water (treated at well site) 1118
2018-02-12 2018-02-12 Recycled Fracturing Water (treated at well site) 2566

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7551 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-14 No Incident Encountered 0.00 0.00
2018-02-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References