X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505130812000

Well Details

Well ID: 0505130812000
Loading map...
Location: 00/12-08-050-13W5/0
Location Alias: 00/12-08-50-13 W5M
Location Alias 2: 00/12-08-050-13 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 13
Section: 08
County/Municipality: Yellowhead County
Well Name: VEI HZ WESTPEM 12-8-50-13
Operator Name: Vermilion Energy Inc.
License Number: 0474138
License Date: 2015-01-08
License Status: Amended
Spud Date: 2015-01-22
Final Drill Date: 2015-02-09
Well Total Depth: 5036.00 m
Surface Hole Latitude: 53.297071
Surface Hole Longitude: -115.829250

For data sources see[1][2]

Well History

Date Event
2015-01-08 Obtained License
2015-01-24 Surface Casing Operation Performed
2015-01-26 Direction Drilling Operation Performed - Deviate
2015-01-27 Direction Drilling Operation Performed - Horizontal
2015-01-28 Well Log Performed
2015-02-09 Finished Drilling
2015-02-09 Well Log Performed
2015-02-09 Well Mode changed to Drilled and Cased
2015-02-10 Well Log Performed
2015-02-12 Production Casing Operation Performed
2015-02-14 Rig Released
2015-02-20 Well Log Performed
2015-02-24 Perforation Treatment Performed - Open-Hole Completion
2015-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-01 Well Began Production
2015-03-01 Well Fluid changed to Crude Oil
2015-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-22 Nabors Drilling Limited 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-26 1626.00 Deviate (5 - 79 degrees)
2015-01-27 2046.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-24 Open Hole/Barefoot Completion 5018.00 5036.00 0
2015-02-26 Multi-Stage Fracture 4306.30 4306.40 0
2015-02-26 Multi-Stage Fracture 4229.70 4229.80 0
2015-02-26 Multi-Stage Fracture 4143.10 4143.20 0
2015-02-26 Multi-Stage Fracture 4053.50 4053.60 0
2015-02-27 Multi-Stage Fracture 3977.00 3977.10 0
2015-02-27 Multi-Stage Fracture 3886.00 3886.10 0
2015-02-27 Multi-Stage Fracture 3794.80 3794.90 0
2015-02-27 Multi-Stage Fracture 3719.30 3719.40 0
2015-02-27 Multi-Stage Fracture 3630.50 3630.60 0
2015-02-27 Multi-Stage Fracture 3542.80 3542.90 0
2015-02-25 Multi-Stage Fracture 4994.10 4994.20 0
2015-02-27 Multi-Stage Fracture 3453.40 3453.50 0
2015-02-27 Multi-Stage Fracture 3377.80 3377.90 0
2015-02-27 Multi-Stage Fracture 3290.00 3290.10 0
2015-02-27 Multi-Stage Fracture 3201.50 3201.60 0
2015-02-27 Multi-Stage Fracture 3113.00 3113.10 0
2015-02-27 Multi-Stage Fracture 3038.50 3038.60 0
2015-02-27 Multi-Stage Fracture 2950.70 2950.80 0
2015-02-27 Multi-Stage Fracture 2862.80 2862.90 0
2015-02-27 Multi-Stage Fracture 2774.90 2775.00 0
2015-02-27 Multi-Stage Fracture 2686.30 2686.40 0
2015-02-25 Multi-Stage Fracture 4904.00 4904.10 0
2015-02-27 Multi-Stage Fracture 2598.00 2598.10 0
2015-02-27 Multi-Stage Fracture 2514.70 2514.80 0
2015-02-27 Multi-Stage Fracture 2439.70 2439.80 0
2015-02-27 Multi-Stage Fracture 2350.50 2350.60 0
2015-02-27 Multi-Stage Fracture 2261.50 2261.60 0
2015-02-27 Multi-Stage Fracture 2185.80 2185.90 0
2015-02-26 Multi-Stage Fracture 4828.40 4828.50 0
2015-02-26 Multi-Stage Fracture 4739.60 4739.70 0
2015-02-26 Multi-Stage Fracture 4649.90 4650.00 0
2015-02-26 Multi-Stage Fracture 4560.80 4560.90 0
2015-02-26 Multi-Stage Fracture 4485.00 4485.10 0
2015-02-26 Multi-Stage Fracture 4397.10 4397.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-25 2015-02-27 1,924 4,904 N/A
2 2015-02-25 2015-02-25 1,924 0 N/A
3 2015-02-26 2015-02-27 1,924 0 N/A
4 2015-02-25 2015-02-26 1,924 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.9625 N/A
water Not Available 100 80.9233 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 12.7482 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.5823 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0113 N/A
dibromoacetonitrile 3252-43-5 100 0.0113 N/A
non-hazardous ingredients Not Available 100 0.0113 N/A
polyethylene glycol 25322-68-3 100 0.0113 N/A
sodium bromide 7647-15-6 100 0.0113 N/A
EnCap-LP Trican Breaker ammonium persulfate 7727-54-0 100 0.015 N/A
cured acrylic resin Not Available 100 0.015 N/A
silica crystalline 14808-60-7 100 0.015 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.0857 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1901 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1901 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0856 N/A
propylene glycol 57-55-6 100 0.0856 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.2263 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.044 N/A
2 pH-6 Trican Buffer ethylene glycol 107-21-1 100 0.0184 N/A
formic acid 64-18-6 100 0.0184 N/A
water Not Available 100 0.0184 N/A
3 CC-6 Trican Clay Control choline chloride 67-48-1 100 0.1719 N/A
formic acid 64-18-6 100 0.1719 N/A
non-hazardous ingredients Not Available 100 0.1719 N/A
4 CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1903 N/A
water Not Available 100 0.1903 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1057 N/A
SS-7 Trican Surfactant aliphatic alcohol 1111 100 0.0172 N/A
aminofunctional polymer 1111 100 0.0172 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0172 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-24 2015-02-27 Groundwater - Non-saline less than or equal to 150m deep 6235

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6240 0.0 0.0 0.0
2016 8517 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8739 0.0 0.0 0.0
2019 8405 0.0 0.0 0.0
2020 2166 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-14 No Incident Encountered 0.00 0.00
2015-03-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References