X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505123409030

Well Details

Well ID: 0505123409030
Loading map...
Location: 03/09-34-050-12W5/0
Location Alias: 03/09-34-50-12 W5M
Location Alias 2: 03/09-34-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 34
County/Municipality: Yellowhead County
Well Name: BONTERRA 103 HZ PEMBINA 9-34-50-12
Operator Name: Bonterra Energy Corp.
License Number: 0479357
License Date: 2016-04-28
License Status: Issued
Spud Date: 2016-05-27
Final Drill Date: 2016-06-05
Well Total Depth: 4190.00 m
Surface Hole Latitude: 53.362530
Surface Hole Longitude: -115.699568

For data sources see[1][2]

Well History

Date Event
2016-04-28 Obtained License
2016-05-27 Surface Casing Operation Performed
2016-05-29 Direction Drilling Operation Performed - Deviate
2016-05-30 Direction Drilling Operation Performed - Horizontal
2016-05-30 Well Log Performed
2016-06-05 Finished Drilling
2016-06-05 Well Mode changed to Drilled and Cased
2016-06-07 Production Casing Operation Performed
2016-06-08 Rig Released
2016-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-20 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-01 Well Began Production
2016-07-01 Well Fluid changed to Crude Oil
2016-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-05-27 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-05-29 1417.60 Deviate (5 - 79 degrees)
2016-05-30 1919.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-06-14 Multi-Stage Fracture 4150.00 4151.30 0
2016-06-19 Multi-Stage Fracture 3669.20 3669.80 0
2016-06-19 Multi-Stage Fracture 3618.60 3619.20 0
2016-06-19 Multi-Stage Fracture 3572.40 3573.00 0
2016-06-19 Multi-Stage Fracture 3511.80 3512.40 0
2016-06-19 Multi-Stage Fracture 3460.20 3460.90 0
2016-06-19 Multi-Stage Fracture 3427.50 3428.20 0
2016-06-19 Multi-Stage Fracture 3366.70 3367.30 0
2016-06-19 Multi-Stage Fracture 3317.00 3317.70 0
2016-06-19 Multi-Stage Fracture 3269.20 3269.80 0
2016-06-19 Multi-Stage Fracture 3207.20 3207.80 0
2016-06-14 Multi-Stage Fracture 4096.00 4096.70 0
2016-06-19 Multi-Stage Fracture 3157.60 3158.20 0
2016-06-19 Multi-Stage Fracture 3096.50 3097.20 0
2016-06-19 Multi-Stage Fracture 3046.00 3046.70 0
2016-06-19 Multi-Stage Fracture 2994.70 2995.40 0
2016-06-19 Multi-Stage Fracture 2935.20 2935.80 0
2016-06-19 Multi-Stage Fracture 2874.40 2875.10 0
2016-06-20 Multi-Stage Fracture 2824.90 2825.60 0
2016-06-20 Multi-Stage Fracture 2775.60 2776.30 0
2016-06-20 Multi-Stage Fracture 2715.00 2715.70 0
2016-06-20 Multi-Stage Fracture 2666.80 2667.50 0
2016-06-15 Multi-Stage Fracture 4050.50 4051.20 0
2016-06-20 Multi-Stage Fracture 2616.70 2617.30 0
2016-06-20 Multi-Stage Fracture 2552.90 2553.60 0
2016-06-20 Multi-Stage Fracture 2500.80 2501.40 0
2016-06-20 Multi-Stage Fracture 2451.00 2451.70 0
2016-06-20 Multi-Stage Fracture 2390.80 2391.40 0
2016-06-20 Multi-Stage Fracture 2340.90 2341.60 0
2016-06-20 Multi-Stage Fracture 2289.30 2290.00 0
2016-06-20 Multi-Stage Fracture 2227.30 2227.90 0
2016-06-20 Multi-Stage Fracture 2174.90 2175.60 0
2016-06-21 Multi-Stage Fracture 2124.80 2125.40 0
2016-06-15 Multi-Stage Fracture 3987.20 3987.80 0
2016-06-21 Multi-Stage Fracture 2063.80 2064.40 0
2016-06-21 Multi-Stage Fracture 2015.50 2016.10 0
2016-06-21 Multi-Stage Fracture 1954.60 1955.30 0
2016-06-16 Multi-Stage Fracture 3936.90 3937.50 0
2016-06-16 Multi-Stage Fracture 3886.50 3887.20 0
2016-06-16 Multi-Stage Fracture 3825.00 3825.70 0
2016-06-17 Multi-Stage Fracture 3775.00 3775.60 0
2016-06-18 Multi-Stage Fracture 3727.70 3728.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-06-14 2016-06-21 1,764 4,490 N/A
2 2016-06-18 2016-06-21 1,764 0 N/A
3 2016-06-20 2016-06-20 1,764 0 N/A
4 2016-06-19 2016-06-19 1,764 0 N/A
5 2016-06-19 2016-06-20 1,764 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 90.1561 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 8.7762 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0112 N/A
dibromoacetonitrile 3252-43-5 100 0.0112 N/A
non-hazardous ingredients Not Available 100 0.0112 N/A
polyethylene glycol 25322-68-3 100 0.0112 N/A
sodium bromide 7647-15-6 100 0.0112 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1685 N/A
non-hazardous ingredients Not Available 100 0.1685 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1135 N/A
S-17 Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0486 N/A
water Not Available 100 0.0486 N/A
2 Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 1.1039 N/A
3 Sand 16/30 Trican silica crystalline 14808-60-7 100 0.5592 N/A
4 Sand 30/50 Trican silica crystalline 14808-60-7 100 6.424 N/A
5 Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4988 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-06-20 2016-06-22 Surface Water - Runoff 1967
2016-06-20 2016-06-22 Surface Water - Runoff 2523

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 4048 0.0 0.0 0.0
2017 8638 0.0 0.0 0.0
2018 8674 0.0 0.0 0.0
2019 7961 0.0 0.0 0.0
2020 2093 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-08 No Incident Encountered 0.00 0.00
2016-06-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References