X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122104000

Well Details

Well ID: 0505122104000
Loading map...
Location: 00/04-21-050-12W5/0
Location Alias: 00/04-21-50-12 W5M
Location Alias 2: 00/04-21-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 21
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 4-21-50-12
Operator Name: Ridgeback Resources Inc.
License Number: 0433885
License Date: 2011-05-30
License Status: Issued
Spud Date: 2011-07-25
Final Drill Date: 2011-08-05
Well Total Depth: 3443.00 m
Surface Hole Latitude: 53.340156
Surface Hole Longitude: -115.702139

For data sources see[1][2]

Well History

Date Event
2011-05-30 Obtained License
2011-07-27 Surface Casing Operation Performed
2011-07-29 Direction Drilling Operation Performed - Horizontal
2011-07-31 Well Log Performed
2011-08-01 Well Log Performed
2011-08-05 Finished Drilling
2011-08-05 Perforation Treatment Performed - Open-Hole Completion
2011-08-05 Well Log Performed
2011-08-05 Well Mode changed to Drilled and Cased
2011-08-06 Production Casing Operation Performed
2011-08-06 Well Log Performed
2011-08-07 Rig Released
2011-08-10 Well Log Performed
2011-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-31 Well Began Production
2011-08-31 Well Fluid changed to Crude Oil
2011-08-31 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-29 1406.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-05 Open Hole/Barefoot Completion 3442.00 3443.00 0
2011-08-31 Multi-Stage Fracture 2860.80 2860.90 0
2011-08-31 Multi-Stage Fracture 2784.50 2784.60 0
2011-08-31 Multi-Stage Fracture 2724.90 2725.00 0
2011-08-31 Multi-Stage Fracture 2648.70 2648.80 0
2011-08-31 Multi-Stage Fracture 2587.30 2587.40 0
2011-08-31 Multi-Stage Fracture 2511.90 2512.00 0
2011-08-31 Multi-Stage Fracture 2450.10 2450.20 0
2011-08-31 Multi-Stage Fracture 2388.40 2388.50 0
2011-08-31 Multi-Stage Fracture 2313.60 2313.70 0
2011-08-31 Multi-Stage Fracture 2251.80 2251.90 0
2011-08-30 Multi-Stage Fracture 3399.00 3399.10 0
2011-08-31 Multi-Stage Fracture 2176.30 2176.40 0
2011-08-31 Multi-Stage Fracture 2116.40 2116.50 0
2011-08-30 Multi-Stage Fracture 3330.00 3330.10 0
2011-08-30 Multi-Stage Fracture 3270.00 3270.10 0
2011-08-31 Multi-Stage Fracture 3194.20 3194.30 0
2011-08-31 Multi-Stage Fracture 3132.80 3132.90 0
2011-08-31 Multi-Stage Fracture 3056.20 3056.30 0
2011-08-31 Multi-Stage Fracture 2995.70 2995.80 0
2011-08-31 Multi-Stage Fracture 2921.90 2922.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2687 0.0 0.0 0.0
2012 8591 0.0 0.0 0.0
2013 8515 0.0 0.0 0.0
2014 8560 0.0 0.0 0.0
2015 7435 0.0 0.0 0.0
2016 8781 0.0 0.0 0.0
2017 8718 0.0 0.0 0.0
2018 8570 0.0 0.0 0.0
2019 8712 0.0 0.0 0.0
2020 2140 0.0 0.0 0.0

For data sources see[6]

References