If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505120110020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.309854,"lon":-115.61221,"icon":""}]} |
Location: 02/10-01-050-12W5/0 | |
Location Alias: 02/10-01-50-12 W5M | |
Location Alias 2: 02/10-01-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 01 | |
County/Municipality: Yellowhead County | |
Well Name: BACCALIEU 104 HZ PEMBINA 10-1-50-12 | |
Operator Name: Baccalieu Energy Inc. | |
License Number: 0465264 | |
License Date: 2014-02-21 | |
License Status: Amended | |
Spud Date: 2014-03-16 | |
Final Drill Date: 2014-03-29 | |
Well Total Depth: 4142.00 m | |
Surface Hole Latitude: 53.309854 | |
Surface Hole Longitude: -115.612210 |
Date | Event |
---|---|
2014-02-21 | Obtained License |
2014-03-17 | Surface Casing Operation Performed |
2014-03-19 | Direction Drilling Operation Performed - Deviate |
2014-03-20 | Direction Drilling Operation Performed - Horizontal |
2014-03-22 | Intermediate Casing Operation Performed |
2014-03-22 | Well Log Performed |
2014-03-29 | Finished Drilling |
2014-03-29 | Well Mode changed to Drilled and Cased |
2014-03-30 | Well Log Performed |
2014-04-01 | Liner Casing Operation Performed |
2014-04-01 | Perforation Treatment Performed - Open-Hole Completion |
2014-04-02 | Rig Released |
2014-05-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-09 | Well Began Production |
2014-05-09 | Well Fluid changed to Crude Oil |
2014-05-09 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-03-19 | 1516.90 | Deviate (5 - 79 degrees) |
2014-03-20 | 1904.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-04-01 | Open Hole/Barefoot Completion | 4138.00 | 4142.00 | 0 |
2014-05-08 | Multi-Stage Fracture | 3530.10 | 3530.20 | 0 |
2014-05-08 | Multi-Stage Fracture | 3443.00 | 3443.10 | 0 |
2014-05-08 | Multi-Stage Fracture | 3356.70 | 3356.80 | 0 |
2014-05-08 | Multi-Stage Fracture | 3284.30 | 3284.40 | 0 |
2014-05-08 | Multi-Stage Fracture | 3211.40 | 3211.50 | 0 |
2014-05-08 | Multi-Stage Fracture | 3143.00 | 3143.10 | 0 |
2014-05-08 | Multi-Stage Fracture | 3071.10 | 3071.20 | 0 |
2014-05-08 | Multi-Stage Fracture | 2998.90 | 2999.00 | 0 |
2014-05-08 | Multi-Stage Fracture | 2926.40 | 2926.50 | 0 |
2014-05-08 | Multi-Stage Fracture | 2855.30 | 2855.40 | 0 |
2014-05-07 | Multi-Stage Fracture | 4099.00 | 4099.10 | 0 |
2014-05-08 | Multi-Stage Fracture | 2783.00 | 2783.10 | 0 |
2014-05-08 | Multi-Stage Fracture | 2711.50 | 2711.60 | 0 |
2014-05-08 | Multi-Stage Fracture | 2626.40 | 2626.50 | 0 |
2014-05-08 | Multi-Stage Fracture | 2541.80 | 2541.90 | 0 |
2014-05-08 | Multi-Stage Fracture | 2457.60 | 2457.70 | 0 |
2014-05-08 | Multi-Stage Fracture | 2378.30 | 2378.40 | 0 |
2014-05-08 | Multi-Stage Fracture | 2308.70 | 2308.80 | 0 |
2014-05-08 | Multi-Stage Fracture | 2238.90 | 2239.00 | 0 |
2014-05-08 | Multi-Stage Fracture | 2170.50 | 2170.60 | 0 |
2014-05-08 | Multi-Stage Fracture | 2099.00 | 2099.10 | 0 |
2014-05-07 | Multi-Stage Fracture | 4038.70 | 4038.80 | 0 |
2014-05-08 | Multi-Stage Fracture | 2016.50 | 2016.60 | 0 |
2014-05-08 | Multi-Stage Fracture | 1958.60 | 1958.70 | 0 |
2014-05-08 | Multi-Stage Fracture | 3965.80 | 3965.90 | 0 |
2014-05-08 | Multi-Stage Fracture | 3893.60 | 3893.70 | 0 |
2014-05-08 | Multi-Stage Fracture | 3821.60 | 3821.70 | 0 |
2014-05-08 | Multi-Stage Fracture | 3749.70 | 3749.80 | 0 |
2014-05-08 | Multi-Stage Fracture | 3690.60 | 3690.70 | 0 |
2014-05-08 | Multi-Stage Fracture | 3617.00 | 3617.10 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-05-07 | 2014-05-08 | 1,793 | 3,701 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 81.9639 | N/A | |||
Sand (20/40) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.4724 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.4724 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.4724 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.4723 | N/A | ||||
Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 8.3545 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.3545 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.3545 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.3544 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0116 | N/A | |
Water | 7732-18-5 | 100 | 0.0116 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1784 | N/A | |
Water | 7732-18-5 | 100 | 0.1784 | N/A | ||||
Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 4.8409 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 4.8409 | N/A | ||||
CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0978 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0978 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0978 | N/A | ||||
CAN-2403 nanoFLO | Canyon | Surfactant | Ethanol | 64-17-5 | 100 | 0.0801 | N/A | |
Methanol | 67-56-1 | 100 | 0.0801 | N/A | ||||
Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0801 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0801 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-04-08 | 2014-05-14 | Groundwater - Non-saline less than or equal to 150m deep | 1533 |
2014-04-08 | 2014-05-14 | Groundwater - Non-saline less than or equal to 150m deep | 1690 |
2014-05-07 | 2014-05-08 | Surface Water - Runoff | 247 |
2014-05-08 | 2014-05-08 | Recycled Fracturing Water (treated at well site) | 232 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 5314 | 0.0 | 0.0 | 0.0 |
2015 | 8651 | 0.0 | 0.0 | 0.0 |
2016 | 8616 | 0.0 | 0.0 | 0.0 |
2017 | 8723 | 0.0 | 0.0 | 0.0 |
2018 | 8751 | 0.0 | 0.0 | 0.0 |
2019 | 8219 | 0.0 | 0.0 | 0.0 |
2020 | 2176 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-04-02 | No Incident Encountered | 0.00 | 0.00 |
2014-05-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]