X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505120110020

Well Details

Well ID: 0505120110020
Loading map...
Location: 02/10-01-050-12W5/0
Location Alias: 02/10-01-50-12 W5M
Location Alias 2: 02/10-01-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 01
County/Municipality: Yellowhead County
Well Name: BACCALIEU 104 HZ PEMBINA 10-1-50-12
Operator Name: Baccalieu Energy Inc.
License Number: 0465264
License Date: 2014-02-21
License Status: Amended
Spud Date: 2014-03-16
Final Drill Date: 2014-03-29
Well Total Depth: 4142.00 m
Surface Hole Latitude: 53.309854
Surface Hole Longitude: -115.612210

For data sources see[1][2]

Well History

Date Event
2014-02-21 Obtained License
2014-03-17 Surface Casing Operation Performed
2014-03-19 Direction Drilling Operation Performed - Deviate
2014-03-20 Direction Drilling Operation Performed - Horizontal
2014-03-22 Intermediate Casing Operation Performed
2014-03-22 Well Log Performed
2014-03-29 Finished Drilling
2014-03-29 Well Mode changed to Drilled and Cased
2014-03-30 Well Log Performed
2014-04-01 Liner Casing Operation Performed
2014-04-01 Perforation Treatment Performed - Open-Hole Completion
2014-04-02 Rig Released
2014-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-09 Well Began Production
2014-05-09 Well Fluid changed to Crude Oil
2014-05-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-03-19 1516.90 Deviate (5 - 79 degrees)
2014-03-20 1904.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-04-01 Open Hole/Barefoot Completion 4138.00 4142.00 0
2014-05-08 Multi-Stage Fracture 3530.10 3530.20 0
2014-05-08 Multi-Stage Fracture 3443.00 3443.10 0
2014-05-08 Multi-Stage Fracture 3356.70 3356.80 0
2014-05-08 Multi-Stage Fracture 3284.30 3284.40 0
2014-05-08 Multi-Stage Fracture 3211.40 3211.50 0
2014-05-08 Multi-Stage Fracture 3143.00 3143.10 0
2014-05-08 Multi-Stage Fracture 3071.10 3071.20 0
2014-05-08 Multi-Stage Fracture 2998.90 2999.00 0
2014-05-08 Multi-Stage Fracture 2926.40 2926.50 0
2014-05-08 Multi-Stage Fracture 2855.30 2855.40 0
2014-05-07 Multi-Stage Fracture 4099.00 4099.10 0
2014-05-08 Multi-Stage Fracture 2783.00 2783.10 0
2014-05-08 Multi-Stage Fracture 2711.50 2711.60 0
2014-05-08 Multi-Stage Fracture 2626.40 2626.50 0
2014-05-08 Multi-Stage Fracture 2541.80 2541.90 0
2014-05-08 Multi-Stage Fracture 2457.60 2457.70 0
2014-05-08 Multi-Stage Fracture 2378.30 2378.40 0
2014-05-08 Multi-Stage Fracture 2308.70 2308.80 0
2014-05-08 Multi-Stage Fracture 2238.90 2239.00 0
2014-05-08 Multi-Stage Fracture 2170.50 2170.60 0
2014-05-08 Multi-Stage Fracture 2099.00 2099.10 0
2014-05-07 Multi-Stage Fracture 4038.70 4038.80 0
2014-05-08 Multi-Stage Fracture 2016.50 2016.60 0
2014-05-08 Multi-Stage Fracture 1958.60 1958.70 0
2014-05-08 Multi-Stage Fracture 3965.80 3965.90 0
2014-05-08 Multi-Stage Fracture 3893.60 3893.70 0
2014-05-08 Multi-Stage Fracture 3821.60 3821.70 0
2014-05-08 Multi-Stage Fracture 3749.70 3749.80 0
2014-05-08 Multi-Stage Fracture 3690.60 3690.70 0
2014-05-08 Multi-Stage Fracture 3617.00 3617.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-05-07 2014-05-08 1,793 3,701 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.9639 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 4.4724 N/A
Crystalline silica. quartz 14808-60-7 100 4.4724 N/A
Iron Oxide 1309-37-1 100 4.4724 N/A
Titanium Oxide 13463-67-7 100 4.4723 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 8.3545 N/A
Crystalline silica. quartz 14808-60-7 100 8.3545 N/A
Iron Oxide 1309-37-1 100 8.3545 N/A
Titanium Oxide 13463-67-7 100 8.3544 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0116 N/A
Water 7732-18-5 100 0.0116 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1784 N/A
Water 7732-18-5 100 0.1784 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 4.8409 N/A
Non-hazardous base ingredient(s) Not Available 100 4.8409 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0978 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0978 N/A
Water 7732-18-5 100 0.0978 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0801 N/A
Methanol 67-56-1 100 0.0801 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0801 N/A
Water 7732-18-5 100 0.0801 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-04-08 2014-05-14 Groundwater - Non-saline less than or equal to 150m deep 1533
2014-04-08 2014-05-14 Groundwater - Non-saline less than or equal to 150m deep 1690
2014-05-07 2014-05-08 Surface Water - Runoff 247
2014-05-08 2014-05-08 Recycled Fracturing Water (treated at well site) 232

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5314 0.0 0.0 0.0
2015 8651 0.0 0.0 0.0
2016 8616 0.0 0.0 0.0
2017 8723 0.0 0.0 0.0
2018 8751 0.0 0.0 0.0
2019 8219 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-04-02 No Incident Encountered 0.00 0.00
2014-05-16 No Incident Encountered 0.00 0.00

For data sources see[9]

References