If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505113309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.364267,"lon":-115.575329,"icon":""}]} |
Location: 00/09-33-050-11W5/0 | |
Location Alias: 00/09-33-50-11 W5M | |
Location Alias 2: 00/09-33-050-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 11 | |
Section: 33 | |
County/Municipality: Brazeau County | |
Well Name: VEI HZ CYN-PEM 9-33-50-11 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0457719 | |
License Date: 2013-06-26 | |
License Status: Issued | |
Spud Date: 2013-08-24 | |
Final Drill Date: 2013-09-03 | |
Well Total Depth: 4061.00 m | |
Surface Hole Latitude: 53.364267 | |
Surface Hole Longitude: -115.575329 |
Date | Event |
---|---|
2013-06-26 | Obtained License |
2013-08-26 | Surface Casing Operation Performed |
2013-08-27 | Direction Drilling Operation Performed - Deviate |
2013-08-28 | Direction Drilling Operation Performed - Horizontal |
2013-09-03 | Finished Drilling |
2013-09-03 | Well Log Performed |
2013-09-03 | Well Mode changed to Drilled and Cased |
2013-09-04 | Production Casing Operation Performed |
2013-09-04 | Well Began Production |
2013-09-04 | Well Fluid changed to Crude Oil |
2013-09-04 | Well Mode changed to Pumping |
2013-09-05 | Rig Released |
2013-09-09 | Well Log Performed |
2013-09-16 | Perforation Treatment Performed - Open-Hole Completion |
2013-09-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-08-24 | Nabors Drilling Limited | 15 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-08-27 | 1396.20 | Deviate (5 - 79 degrees) |
2013-08-28 | 1858.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-09-16 | Open Hole/Barefoot Completion | 4057.00 | 4061.00 | 0 |
2013-09-17 | Multi-Stage Fracture | 3217.30 | 3217.40 | 0 |
2013-09-17 | Multi-Stage Fracture | 3114.50 | 3114.60 | 0 |
2013-09-17 | Multi-Stage Fracture | 3011.10 | 3011.20 | 0 |
2013-09-17 | Multi-Stage Fracture | 2911.00 | 2911.10 | 0 |
2013-09-17 | Multi-Stage Fracture | 2807.70 | 2807.80 | 0 |
2013-09-17 | Multi-Stage Fracture | 2704.60 | 2704.70 | 0 |
2013-09-17 | Multi-Stage Fracture | 2587.30 | 2587.40 | 0 |
2013-09-17 | Multi-Stage Fracture | 2484.20 | 2484.30 | 0 |
2013-09-17 | Multi-Stage Fracture | 2380.90 | 2381.00 | 0 |
2013-09-17 | Multi-Stage Fracture | 2279.20 | 2279.30 | 0 |
2013-09-17 | Multi-Stage Fracture | 4031.80 | 4031.90 | 0 |
2013-09-17 | Multi-Stage Fracture | 2175.90 | 2176.00 | 0 |
2013-09-17 | Multi-Stage Fracture | 2073.20 | 2073.30 | 0 |
2013-09-18 | Multi-Stage Fracture | 1958.40 | 1958.50 | 0 |
2013-09-18 | Multi-Stage Fracture | 1900.20 | 1900.30 | 0 |
2013-09-17 | Multi-Stage Fracture | 3954.10 | 3954.20 | 0 |
2013-09-17 | Multi-Stage Fracture | 3851.40 | 3851.50 | 0 |
2013-09-17 | Multi-Stage Fracture | 3748.00 | 3748.10 | 0 |
2013-09-17 | Multi-Stage Fracture | 3644.10 | 3644.20 | 0 |
2013-09-17 | Multi-Stage Fracture | 3540.90 | 3541.00 | 0 |
2013-09-17 | Multi-Stage Fracture | 3437.90 | 3438.00 | 0 |
2013-09-17 | Multi-Stage Fracture | 3334.30 | 3334.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-17 | 2013-09-18 | 1,718 | 2,155 | N/A |
2 | 2013-09-18 | 2013-09-18 | 1,718 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 4.0682 | N/A | |||
water | 7732-18-5 | 100 | 77.8393 | N/A | ||||
Sand (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 17.4178 | N/A | ||
Sand (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 0.4713 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0097 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0097 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0097 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0097 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0097 | N/A | ||||
EnCap-LP | Trican | Breaker | ammonium persulfate | 7727-54-0 | 100 | 0.0172 | N/A | |
cured acrylic resin | Not Available | 100 | 0.0172 | N/A | ||||
silica crystalline | 14808-60-7 | 100 | 0.0172 | N/A | ||||
DRA-2 | Trican | Buffer | non-hazardous ingredients | Not Available | 100 | 0.0873 | N/A | |
CC-55 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.1704 | N/A | |
formic acid | 64-18-6 | 100 | 0.1704 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.1704 | N/A | ||||
WXB-10 | Trican | Crosslinker | borate salts | 1319-33-1 | 100 | 0.2053 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.2053 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0856 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0856 | N/A | ||||
WG-111L Rapid Gellant | Trican | Gelling Agent | distillates (petroleum). hydrotreated middle | 64742-46-7 | 100 | 0.4387 | N/A | |
polysaccharide blend | Not Available | 100 | 0.4387 | N/A | ||||
2 | GBE 1:5 | Trican | Breaker | non-hazardous ingredients | Not Available | 100 | 0.0415 | N/A |
propylene glycol | 57-55-6 | 100 | 0.0415 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-09-14 | 2013-09-15 | Surface Water - Runoff | 1140 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1635 | 0.0 | 0.0 | 0.0 |
2014 | 8696 | 0.0 | 0.0 | 0.0 |
2015 | 8015 | 0.0 | 0.0 | 0.0 |
2016 | 8566 | 0.0 | 0.0 | 0.0 |
2017 | 8556 | 0.0 | 0.0 | 0.0 |
2018 | 8711 | 0.0 | 0.0 | 0.0 |
2019 | 8732 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-05 | No Incident Encountered | 0.00 | 0.00 |
2013-09-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]