X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505111206022

Well Details

Well ID: 0505111206022
Loading map...
Location: 02/06-12-050-11W5/2
Location Alias: 02/06-12-50-11 W5M
Location Alias 2: 02/06-12-050-11 W5/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 11
Section: 12
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 6-12-50-11
Operator Name: Keyera Energy Ltd.
License Number: 0073756
License Date: 1979-01-03
License Status: Issued
Spud Date: 1979-01-17
Final Drill Date: 1979-03-11
Well Total Depth: 2876.00 m
Surface Hole Latitude: 53.299373
Surface Hole Longitude: -115.481103

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-03 Obtained License
1979-03-02 Drill Stem Test Performed
1979-03-03 Drill Stem Test Performed
1979-03-11 Finished Drilling
1979-03-11 Well Log Performed
1979-03-11 Well Mode changed to Drilled and Cased
1979-03-14 Production Casing Operation Performed
1979-04-03 Perforation Treatment Performed - Jet Perforation
1979-04-05 Perforation Treatment Performed - Cement Squeeze
1979-04-05 Perforation Treatment Performed - Jet Perforation
1979-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-06 Perforation Treatment Performed - Cement Squeeze
1979-04-06 Perforation Treatment Performed - Jet Perforation
1979-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-07 Perforation Treatment Performed - Cement Squeeze
1979-04-12 Perforation Treatment Performed - Jet Perforation
1981-07-18 Perforation Treatment Performed - Jet Perforation
1981-07-18 Well Began Production
1981-07-18 Well Fluid changed to Crude Oil
1981-07-18 Well Mode changed to Flowing
1982-03-03 Well Fluid changed to Crude Oil
1982-03-03 Well Mode changed to Suspended
1982-05-15 Perforation Treatment Performed - Cement Squeeze
1982-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-18 Perforation Treatment Performed - Jet Perforation
1982-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-19 Well Fluid changed to Crude Oil
1982-05-19 Well Mode changed to Flowing
1982-05-24 Perforation Treatment Performed - Jet Perforation
1982-05-25 Perforation Treatment Performed - Fractured
1985-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-16 Perforation Treatment Performed - Cement Squeeze
1985-08-16 Plug Back Performed
1985-08-22 Perforation Treatment Performed - Cement Squeeze
1985-08-22 Plug Back Performed
1985-08-22 Well Fluid changed to Crude Oil
1985-08-22 Well Mode changed to Abandoned Zone
1992-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-24 Perforation Treatment Performed - Chemical Squeeze
1998-08-11 Well Log Performed
1998-08-12 Perforation Treatment Performed - Jet Perforation
1998-08-12 Well Log Performed
1998-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-04-03 Perforation 2785.00 2790.00 3
1979-04-12 Perforation 2746.00 2752.00 3
1981-07-18 Perforation 2700.00 2706.00 3
1982-05-15 Cement Squeeze 2700.00 2706.00 0
1982-05-18 Perforation 2700.00 2706.00 13
1982-05-18 Acid Treatment 2700.00 2706.00 0
1982-05-19 Acid Treatment 2700.00 2706.00 0
1982-05-24 Perforation 2716.00 2724.30 3
1982-05-25 Fracture 2700.00 2724.30 0
1985-08-16 Acid Treatment 2700.00 2724.30 0
1985-08-16 Cement Squeeze 2716.00 2724.30 0
1979-04-05 Cement Squeeze 2785.00 2790.00 0
1985-08-22 Cement Squeeze 2700.00 2706.00 0
1992-03-24 Chemical Squeeze 2746.00 2752.00 0
1992-03-24 Acid Treatment 2746.00 2752.00 0
1998-08-12 Perforation 2737.00 2741.00 14
1998-08-13 Acid Treatment 2737.00 2741.00 0
1979-04-05 Perforation 2730.00 2731.00 3
1979-04-06 Acid Treatment 2730.00 2731.00 0
1979-04-06 Cement Squeeze 2730.00 2731.00 0
1979-04-06 Perforation 2694.00 2695.00 3
1979-04-06 Acid Treatment 2694.00 2695.00 0
1979-04-07 Acid Treatment 2694.00 2695.00 0
1979-04-07 Cement Squeeze 2694.00 2695.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 77 0.0 0.0 0.0
1982 1645 0.0 0.0 0.0
1983 4020 0.0 0.0 0.0
1984 5402 0.0 0.0 0.0
1985 373 0.0 0.0 0.0

For data sources see[5]

References