X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505110312000

Well Details

Well ID: 0505110312000
Loading map...
Location: 00/12-03-050-11W5/0
Location Alias: 00/12-03-50-11 W5M
Location Alias 2: 00/12-03-050-11 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 11
Section: 03
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 12-3-50-11
Operator Name: Keyera Energy Ltd.
License Number: 0139382
License Date: 1989-03-20
License Status: Issued
Spud Date: 1989-03-30
Final Drill Date: 1989-05-10
Well Total Depth: 2930.00 m
Surface Hole Latitude: 53.287912
Surface Hole Longitude: -115.533087

For data sources see[1][2]

Well History

Date Event
1989-03-20 Obtained License
1989-04-01 Surface Casing Operation Performed
1989-04-29 Well Log Performed
1989-05-02 Production Casing Operation Performed
1989-05-10 Finished Drilling
1989-05-10 Kick Occurred
1989-05-10 Lost Circulation Occurred
1989-05-10 Perforation Treatment Performed - Open-Hole Completion
1989-05-10 Well Log Performed
1989-05-10 Well Mode changed to Drilled and Cased
1989-05-11 Rig Released
1989-08-13 Liner Casing Operation Performed
1989-08-13 Perforation Treatment Performed - Cement Squeeze
1989-08-17 Well Log Performed
1989-08-18 Perforation Treatment Performed - Jet Perforation
1989-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-27 Well Began Production
1989-08-27 Well Fluid changed to Crude Oil
1989-08-27 Well Mode changed to Flowing
1990-10-03 Well Log Performed
1991-06-25 Well Log Performed
1992-05-05 Perforation Treatment Performed - Chemical Squeeze
1996-06-04 Perforation Treatment Performed - Jet Perforation
1996-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-05-10 Open Hole/Barefoot Completion 2809.00 2930.00 0
1989-08-13 Cement Squeeze 2809.00 2930.00 0
1989-08-18 Perforation 2858.50 2861.00 13
1989-08-25 Acid Treatment 2858.50 2861.00 0
1992-05-05 Chemical Squeeze 2858.50 2861.00 0
1996-06-04 Perforation 2854.00 2857.00 13
1996-06-04 Perforation 2862.00 2865.00 13
1996-06-05 Acid Treatment 2854.00 2865.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2103 0.0 0.0 0.0
1990 7980 0.0 0.0 0.0
1991 8266 0.0 0.0 0.0
1992 8305 0.0 0.0 0.0
1993 7211 0.0 0.0 0.0
1994 6866 0.0 0.0 0.0
1995 8355 0.0 0.0 0.0
1996 7406 0.0 0.0 0.0
1997 8054 0.0 0.0 0.0
1998 8472 0.0 0.0 0.0
1999 8573 0.0 0.0 0.0
2000 8508 0.0 0.0 0.0
2001 8711 0.0 0.0 0.0
2002 8443 0.0 0.0 0.0
2003 8666 0.0 0.0 0.0
2004 8135 0.0 0.0 0.0
2005 8481 0.0 0.0 0.0
2006 8498 0.0 0.0 0.0
2007 7359 0.0 0.0 0.0
2008 3839 0.0 0.0 0.0
2009 5140 0.0 0.0 0.0
2010 6814 0.0 0.0 0.0
2011 5457 0.0 0.0 0.0
2012 4956 0.0 0.0 0.0
2013 2479 0.0 0.0 0.0
2014 7632 0.0 0.0 0.0
2015 7228 0.0 0.0 0.0
2016 8473 0.0 0.0 0.0
2017 8668 0.0 0.0 0.0
2018 1872 0.0 0.0 0.0
2019 2040 0.0 0.0 0.0
2020 672 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-05-10 Lost Circulation 2899.00 2917.00
1989-05-10 Kick 2930.00 2930.00

For data sources see[6]

References