If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505091808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.312939,"lon":-115.320625,"icon":""}]} |
Location: 00/08-18-050-09W5/0 | |
Location Alias: 00/08-18-50-09 W5M | |
Location Alias 2: 00/08-18-050-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 09 | |
Section: 18 | |
County/Municipality: Brazeau County | |
Well Name: RIDGEBACK PEMBINA 8-18-50-9 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0442013 | |
License Date: 2011-12-23 | |
License Status: Issued | |
Spud Date: 2012-01-27 | |
Final Drill Date: 2012-02-04 | |
Well Total Depth: 3035.00 m | |
Surface Hole Latitude: 53.312939 | |
Surface Hole Longitude: -115.320625 |
Date | Event |
---|---|
2011-12-23 | Obtained License |
2012-01-27 | Lost Circulation Occurred |
2012-01-29 | Surface Casing Operation Performed |
2012-01-30 | Well Log Performed |
2012-01-31 | Direction Drilling Operation Performed - Horizontal |
2012-02-04 | Finished Drilling |
2012-02-04 | Well Log Performed |
2012-02-04 | Well Mode changed to Drilled and Cased |
2012-02-05 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-05 | Production Casing Operation Performed |
2012-02-07 | Rig Released |
2012-02-08 | Well Log Performed |
2012-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-16 | Well Began Production |
2012-02-16 | Well Fluid changed to Crude Oil |
2012-02-16 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-27 | Precision Drilling Corporation | 184 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-31 | 1695.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-05 | Open Hole/Barefoot Completion | 3030.50 | 3035.00 | 0 |
2012-02-15 | Multi-Stage Fracture | 2478.30 | 2478.40 | 0 |
2012-02-15 | Multi-Stage Fracture | 2407.90 | 2408.00 | 0 |
2012-02-15 | Multi-Stage Fracture | 2349.00 | 2349.10 | 0 |
2012-02-15 | Multi-Stage Fracture | 2276.20 | 2276.30 | 0 |
2012-02-15 | Multi-Stage Fracture | 2218.60 | 2218.70 | 0 |
2012-02-15 | Multi-Stage Fracture | 2146.70 | 2146.80 | 0 |
2012-02-15 | Multi-Stage Fracture | 2087.60 | 2087.70 | 0 |
2012-02-15 | Multi-Stage Fracture | 2015.30 | 2015.40 | 0 |
2012-02-15 | Multi-Stage Fracture | 1957.80 | 1957.90 | 0 |
2012-02-15 | Multi-Stage Fracture | 1884.10 | 1884.20 | 0 |
2012-02-14 | Multi-Stage Fracture | 3005.00 | 3005.10 | 0 |
2012-02-15 | Multi-Stage Fracture | 1826.10 | 1826.20 | 0 |
2012-02-15 | Multi-Stage Fracture | 1756.00 | 1756.10 | 0 |
2012-02-14 | Multi-Stage Fracture | 2938.40 | 2938.50 | 0 |
2012-02-14 | Multi-Stage Fracture | 2878.50 | 2878.60 | 0 |
2012-02-14 | Multi-Stage Fracture | 2807.80 | 2807.90 | 0 |
2012-02-14 | Multi-Stage Fracture | 2736.00 | 2736.10 | 0 |
2012-02-14 | Multi-Stage Fracture | 2678.20 | 2678.30 | 0 |
2012-02-14 | Multi-Stage Fracture | 2607.80 | 2607.90 | 0 |
2012-02-15 | Multi-Stage Fracture | 2550.00 | 2550.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6967 | 0.0 | 0.0 | 0.0 |
2013 | 8574 | 0.0 | 0.0 | 0.0 |
2014 | 8460 | 0.0 | 0.0 | 0.0 |
2015 | 8197 | 0.0 | 0.0 | 0.0 |
2016 | 8565 | 0.0 | 0.0 | 0.0 |
2017 | 8075 | 0.0 | 0.0 | 0.0 |
2018 | 8003 | 0.0 | 0.0 | 0.0 |
2019 | 8668 | 0.0 | 0.0 | 0.0 |
2020 | 2039 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-01-27 | Lost Circulation | 26.00 | 150.00 |
For data sources see[8]