X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505061516020

Well Details

Well ID: 0505061516020
Loading map...
Location: 02/16-15-050-06W5/0
Location Alias: 02/16-15-50-06 W5M
Location Alias 2: 02/16-15-050-06 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 06
Section: 15
County/Municipality: Brazeau County
Well Name: DAYLIGHT 102 HZ PEMBINA 16-15-50-6
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0418619
License Date: 2010-02-16
License Status: Issued
Spud Date: 2010-03-02
Final Drill Date: 2010-03-16
Well Total Depth: 2658.00 m
Surface Hole Latitude: 53.309804
Surface Hole Longitude: -114.780744

For data sources see[1][2]

Well History

Date Event
2010-02-16 Obtained License
2010-02-23 Well Log Performed
2010-03-06 Surface Casing Operation Performed
2010-03-09 Direction Drilling Operation Performed - Horizontal
2010-03-16 Finished Drilling
2010-03-16 Well Log Performed
2010-03-16 Well Mode changed to Drilled and Cased
2010-03-20 Production Casing Operation Performed
2010-03-21 Rig Released
2010-03-31 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-31 Perforation Treatment Performed - Open-Hole Completion
2010-04-01 Well Began Production
2010-04-01 Well Fluid changed to Crude Oil
2010-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-09 1022.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-31 Open Hole/Barefoot Completion 2653.00 2658.00 0
2010-03-31 Multi-Stage Fracture 2033.30 2033.40 0
2010-03-31 Multi-Stage Fracture 1958.80 1958.90 0
2010-03-31 Multi-Stage Fracture 1885.40 1885.50 0
2010-03-31 Multi-Stage Fracture 1809.60 1809.70 0
2010-03-31 Multi-Stage Fracture 1733.50 1733.60 0
2010-03-31 Multi-Stage Fracture 1657.60 1657.70 0
2010-03-31 Multi-Stage Fracture 1581.00 1581.10 0
2010-03-31 Multi-Stage Fracture 1503.70 1503.80 0
2010-03-31 Multi-Stage Fracture 1426.70 1426.80 0
2010-03-31 Multi-Stage Fracture 1363.20 1363.30 0
2010-03-31 Multi-Stage Fracture 2627.10 2627.20 0
2010-03-31 Multi-Stage Fracture 2559.70 2559.80 0
2010-03-31 Multi-Stage Fracture 2482.30 2482.40 0
2010-03-31 Multi-Stage Fracture 2407.10 2407.20 0
2010-03-31 Multi-Stage Fracture 2336.80 2336.90 0
2010-03-31 Multi-Stage Fracture 2261.40 2261.50 0
2010-03-31 Multi-Stage Fracture 2186.10 2186.20 0
2010-03-31 Multi-Stage Fracture 2108.30 2108.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6277 0.0 0.0 0.0
2011 8625 0.0 0.0 0.0
2012 8527 0.0 0.0 0.0
2013 8516 0.0 0.0 0.0
2014 8474 0.0 0.0 0.0
2015 7754 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 4402 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References