X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263512020

Well Details

Well ID: 0504263512020
Loading map...
Location: 02/12-35-050-26W4/0
Location Alias: 02/12-35-50-26 W4M
Location Alias 2: 02/12-35-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 35
County/Municipality: Devon
Well Name: IMP LEDUC IN 12-35N-50-26
Operator Name: Imperial Oil Limited
License Number: B0002395
License Date: 1948-10-08
License Status: RecCertified
Spud Date: 1948-10-14
Final Drill Date: 1948-12-22
Well Total Depth: 1472.20 m
Surface Hole Latitude: 53.361124
Surface Hole Longitude: -113.707224

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-10-08 Obtained License
1948-10-14 Direction Drilling Operation Performed - 98
1948-12-22 Finished Drilling
1948-12-22 Production Casing Operation Performed
1948-12-22 Well Mode changed to Drilled and Cased
1948-12-26 Perforation Treatment Performed - Open-Hole Completion
1948-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-01-06 Perforation Treatment Performed - Cement Squeeze
1949-01-09 Perforation Treatment Performed - Bullet Perforation
1949-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-03-14 Well Began Production
1949-03-14 Well Fluid changed to Crude Oil
1949-03-14 Well Mode changed to Pumping
1966-01-01 Well Fluid changed to Crude Oil
1966-01-01 Well Mode changed to Suspended
1968-10-19 Well Began Injection
1968-10-19 Well Fluid changed to Water
1968-10-19 Well Type changed to Injection
1972-01-01 Well Fluid changed to Water
1972-01-01 Well Mode changed to Suspended
1972-01-01 Well Type changed to Injection
1973-07-17 Perforation Treatment Performed - Cement Plug
1973-07-17 Well Fluid changed to Water
1973-07-17 Well Mode changed to Abandoned
1973-07-17 Well Type changed to Injection
1973-07-19 Perforation Treatment Performed - Cement Plug
1973-07-24 Perforation Treatment Performed - Cement Plug
1973-07-25 Perforation Treatment Performed - Cement Plug

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1948-10-14 1152.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-12-26 Open Hole/Barefoot Completion 1412.70 1472.20 0
1973-07-19 Cement Plug 779.40 1087.50 0
1973-07-24 Cement Plug 478.50 515.10 0
1973-07-24 Cement Plug 335.60 367.30 0
1973-07-25 Cement Plug 77.70 182.90 0
1948-12-29 Acid Treatment 1412.70 1472.20 0
1949-01-03 Acid Treatment 1412.70 1472.20 0
1949-01-06 Cement Squeeze 1412.70 1472.20 0
1949-01-09 Bullet Perforation 1417.30 1424.90 7
1949-01-09 Bullet Perforation 1431.00 1437.10 7
1949-01-10 Acid Treatment 1417.30 1437.10 0
1949-01-15 Acid Treatment 1417.30 1437.10 0
1973-07-17 Cement Plug 1341.70 1472.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0

For data sources see[6]

References