X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262808020

Well Details

Well ID: 0504262808020
Loading map...
Location: 02/08-28-050-26W4/0
Location Alias: 02/08-28-50-26 W4M
Location Alias 2: 02/08-28-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 28
County/Municipality: Devon
Well Name: IMPERIAL LEDUC NO. 326 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0002513
License Date: 1951-01-06
License Status: RecCertified
Spud Date: 1951-02-26
Final Drill Date: 1951-03-16
Well Total Depth: 1530.10 m
Surface Hole Latitude: 53.343282
Surface Hole Longitude: -113.735026

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-01-06 Obtained License
1951-03-16 Finished Drilling
1951-03-16 Well Mode changed to Drilled and Cased
1951-03-17 Production Casing Operation Performed
1951-03-19 Perforation Treatment Performed - Open-Hole Completion
1951-03-21 Well Began Production
1951-03-21 Well Fluid changed to Crude Oil
1951-03-21 Well Mode changed to Flowing
1963-08-29 Well Fluid changed to Crude Oil
1963-08-29 Well Mode changed to Pumping
1989-10-29 Well Fluid changed to Crude Oil
1989-10-29 Well Mode changed to Suspended
1996-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-17 Plug Back Performed
1996-07-17 Well Fluid changed to Crude Oil
1996-07-17 Well Log Performed
1996-07-17 Well Mode changed to Abandoned Zone
1996-07-18 Perforation Treatment Performed - Jet Perforation
1996-08-07 Perforation Treatment Performed - Remedial Casing
1996-08-13 Well Abandoned
1996-08-13 Well Fluid changed to Crude Oil
1996-08-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-03-19 Open Hole/Barefoot Completion 1499.60 1530.10 0
1996-07-17 Packing Device Capped w/Cement 1487.00 1495.00 0
1996-07-17 Packing Device Capped w/Cement 1227.00 1235.00 0
1996-07-18 Perforation 160.00 161.00 13
1996-08-07 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8553 0.0 0.0 0.0
1968 8593 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8212 0.0 0.0 0.0
1971 2472 0.0 0.0 0.0
1972 8700 0.0 0.0 0.0
1973 6255 0.0 0.0 0.0
1974 312 0.0 0.0 0.0
1975 922 0.0 0.0 0.0
1976 659 0.0 0.0 0.0
1977 7240 0.0 0.0 0.0
1978 8534 0.0 0.0 0.0
1979 8615 0.0 0.0 0.0
1980 8087 0.0 0.0 0.0
1981 8631 0.0 0.0 0.0
1982 7896 0.0 0.0 0.0
1983 8504 0.0 0.0 0.0
1984 8464 0.0 0.0 0.0
1985 8196 0.0 0.0 0.0
1986 8489 0.0 0.0 0.0
1987 7871 0.0 0.0 0.0
1988 8098 0.0 0.0 0.0
1989 6731 0.0 0.0 0.0

For data sources see[5]

References