X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262803020

Well Details

Well ID: 0504262803020
Loading map...
Location: 02/03-28-050-26W4/0
Location Alias: 02/03-28-50-26 W4M
Location Alias 2: 02/03-28-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 28
County/Municipality: Devon
Well Name: IMPERIAL LEDUC NO. 49
Operator Name: Imperial Oil Resources Limited
License Number: B0002050
License Date: 1948-03-16
License Status: RecCertified
Spud Date: 1948-03-26
Final Drill Date: 1948-05-16
Well Total Depth: 1549.90 m
Surface Hole Latitude: 53.339824
Surface Hole Longitude: -113.747680

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-03-16 Obtained License
1948-04-11 Drill Stem Test Performed
1948-04-17 Drill Stem Test Performed
1948-04-18 Drill Stem Test Performed
1948-04-19 Drill Stem Test Performed
1948-04-20 Drill Stem Test Performed
1948-05-16 Finished Drilling
1948-05-16 Well Mode changed to Drilled and Cased
1948-05-18 Liner Casing Operation Performed
1948-05-20 Perforation Treatment Performed - Open-Hole Completion
1948-05-22 Well Began Production
1948-05-22 Well Fluid changed to Crude Oil
1948-05-22 Well Mode changed to Flowing
1962-11-05 Well Fluid changed to Crude Oil
1962-11-05 Well Mode changed to Pumping
1978-05-27 Perforation Treatment Performed - Cement Squeeze
1978-06-01 Perforation Treatment Performed - Jet Perforation
1978-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-09 Well Began Injection
1978-06-09 Well Fluid changed to Water
1978-06-09 Well Type changed to Injection
1987-05-15 Well Log Performed
1996-06-12 Well Log Performed
1996-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-13 Perforation Treatment Performed - Jet Perforation
1996-06-13 Perforation Treatment Performed - Remedial Casing
1996-06-13 Plug Back Performed
1996-07-23 Well Fluid changed to Water
1996-07-23 Well Mode changed to Abandoned
1996-07-23 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-05-20 Open Hole/Barefoot Completion 1507.20 1549.90 0
1978-05-27 Cement Squeeze 1507.20 1549.90 0
1978-06-01 Perforation 1517.90 1548.40 7
1978-06-02 Acid Treatment 1517.90 1548.40 0
1996-06-13 Packing Device Capped w/Cement 1497.00 1505.00 0
1996-06-13 Packing Device Capped w/Cement 1224.00 1232.00 0
1996-06-13 Perforation 160.00 161.00 7
1996-06-13 Remedial Casing Cementing 160.00 161.00 0
1996-06-13 Packing Device Capped w/Cement 46.90 165.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8625 0.0 0.0 0.0
1968 8661 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8655 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8700 0.0 0.0 0.0
1973 8583 0.0 0.0 0.0
1974 8595 0.0 0.0 0.0
1975 7808 0.0 0.0 0.0
1976 7352 0.0 0.0 0.0
1977 7325 0.0 0.0 0.0
1978 2672 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0

For data sources see[5]

References