X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262614000

Well Details

Well ID: 0504262614000
Loading map...
Location: 00/14-26-050-26W4/0
Location Alias: 00/14-26-50-26 W4M
Location Alias 2: 00/14-26-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 26
County/Municipality: Devon
Well Name: MEC LEDUC-WB 14-26-50-26
Operator Name: NEP Canada ULC
License Number: B0002221
License Date: 1948-07-24
License Status: Abandoned
Spud Date: 1948-10-29
Final Drill Date: 1948-11-21
Well Total Depth: 1614.50 m
Surface Hole Latitude: 53.350507
Surface Hole Longitude: -113.698819

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-07-24 Obtained License
1948-11-13 Drill Stem Test Performed
1948-11-14 Drill Stem Test Performed
1948-11-21 Finished Drilling
1948-11-21 Well Mode changed to Drilled and Cased
1948-11-24 Liner Casing Operation Performed
1948-11-29 Perforation Treatment Performed - Bullet Perforation
1948-12-02 Perforation Treatment Performed - Acid Wash - No Pressure
1948-12-03 Well Began Production
1948-12-03 Well Fluid changed to Crude Oil
1948-12-03 Well Mode changed to Flowing
1976-11-01 Well Fluid changed to Crude Oil
1976-11-01 Well Mode changed to Pumping
1984-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-23 Perforation Treatment Performed - Cement Squeeze
1984-08-28 Perforation Treatment Performed - Jet Perforation
1984-08-30 Perforation Treatment Performed - Cement Squeeze
1984-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-05 Perforation Treatment Performed - Jet Perforation
1989-01-08 Well Fluid changed to Crude Oil
1989-01-08 Well Mode changed to Suspended
1993-09-03 Well Log Performed
2001-04-04 Perforation Treatment Performed - Jet Perforation
2001-04-04 Well Fluid changed to Crude Oil
2001-04-04 Well Mode changed to Suspended
2001-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-10 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-07-11 Perforation Treatment Performed - Jet Perforation
2002-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-12 Plug Back Performed
2002-07-12 Well Fluid changed to Crude Oil
2002-07-12 Well Mode changed to Abandoned Zone
2002-07-14 Perforation Treatment Performed - Jet Perforation
2002-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-09-05 Well Log Performed
2019-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-06 Plug Back Performed
2019-09-06 Well Log Performed
2019-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-07 Perforation Treatment Performed - Jet Perforation
2019-09-07 Plug Back Performed
2019-09-07 Well Log Performed
2019-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-08 Perforation Treatment Performed - Cement Squeeze
2019-09-08 Perforation Treatment Performed - Jet Perforation
2019-09-08 Plug Back Performed
2019-09-08 Well Log Performed
2019-10-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-11-29 Bullet Perforation 1610.90 1612.40 10
2001-04-06 Acid Treatment 1591.00 1593.50 0
2002-07-10 Bridge Plug, No Cement 1585.00 1586.00 0
2002-07-11 Perforation 1553.00 1554.50 17
2002-07-12 Packing Device Capped w/Cement 1537.00 1545.00 0
2002-07-14 Perforation 1316.00 1323.00 17
2002-07-14 Perforation 1328.00 1331.00 17
2002-07-16 Acid Treatment 1316.00 1323.00 0
2002-07-16 Acid Treatment 1328.00 1331.00 0
2019-09-06 Packing Device Capped w/Cement 1304.00 1312.00 0
2019-09-07 Packing Device Capped w/Cement 575.00 583.00 0
1948-12-02 Acid Wash 1610.90 1612.40 0
2019-09-07 Perforation 313.00 314.00 13
2019-09-07 Packing Device Capped w/Cement 300.00 308.00 0
2019-09-07 Perforation 200.00 201.00 13
2019-09-07 Perforation 105.00 106.00 13
2019-09-08 Packing Device Capped w/Cement 188.00 196.00 0
2019-09-08 Perforation 150.00 151.00 13
2019-09-08 Cement Squeeze 150.00 151.00 0
2019-09-08 Packing Device Capped w/Cement 142.00 150.00 0
2019-09-08 Cement Squeeze 105.00 106.00 0
2019-09-08 Packing Device Capped w/Cement 92.00 100.00 0
1984-08-23 Acid Treatment 1610.90 1612.40 0
1984-08-23 Cement Squeeze 1610.90 1612.40 0
1984-08-28 Perforation 1609.50 1609.60 3
1984-08-30 Cement Squeeze 1609.50 1609.60 0
1984-09-05 Perforation 1609.00 1609.10 3
1984-09-05 Acid Treatment 1609.00 1609.10 0
2001-04-04 Perforation 1591.00 1593.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7707 0.0 0.0 0.0
1968 3676 0.0 0.0 0.0
1969 1164 0.0 0.0 0.0
1970 3719 0.0 0.0 0.0
1971 6272 0.0 0.0 0.0
1972 7342 0.0 0.0 0.0
1973 8476 0.0 0.0 0.0
1974 8469 0.0 0.0 0.0
1975 8341 0.0 0.0 0.0
1976 7434 0.0 0.0 0.0
1977 6960 0.0 0.0 0.0
1978 7995 0.0 0.0 0.0
1979 6187 0.0 0.0 0.0
1980 6975 0.0 0.0 0.0
1981 6353 0.0 0.0 0.0
1982 7499 0.0 0.0 0.0
1983 7688 0.0 0.0 0.0
1984 2892 0.0 0.0 0.0
1985 5712 0.0 0.0 0.0
1986 692 0.0 0.0 0.0
1987 5166 0.0 0.0 0.0
1988 6226 0.0 0.0 0.0
1989 168 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References