If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504262614000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.350507,"lon":-113.698819,"icon":""}]} |
| Location: 00/14-26-050-26W4/0 | |
| Location Alias: 00/14-26-50-26 W4M | |
| Location Alias 2: 00/14-26-050-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 26 | |
| County/Municipality: Devon | |
| Well Name: MEC LEDUC-WB 14-26-50-26 | |
| Operator Name: NEP Canada ULC | |
| License Number: B0002221 | |
| License Date: 1948-07-24 | |
| License Status: Abandoned | |
| Spud Date: 1948-10-29 | |
| Final Drill Date: 1948-11-21 | |
| Well Total Depth: 1614.50 m | |
| Surface Hole Latitude: 53.350507 | |
| Surface Hole Longitude: -113.698819 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1948-07-24 | Obtained License |
| 1948-11-13 | Drill Stem Test Performed |
| 1948-11-14 | Drill Stem Test Performed |
| 1948-11-21 | Finished Drilling |
| 1948-11-21 | Well Mode changed to Drilled and Cased |
| 1948-11-24 | Liner Casing Operation Performed |
| 1948-11-29 | Perforation Treatment Performed - Bullet Perforation |
| 1948-12-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1948-12-03 | Well Began Production |
| 1948-12-03 | Well Fluid changed to Crude Oil |
| 1948-12-03 | Well Mode changed to Flowing |
| 1976-11-01 | Well Fluid changed to Crude Oil |
| 1976-11-01 | Well Mode changed to Pumping |
| 1984-08-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-08-23 | Perforation Treatment Performed - Cement Squeeze |
| 1984-08-28 | Perforation Treatment Performed - Jet Perforation |
| 1984-08-30 | Perforation Treatment Performed - Cement Squeeze |
| 1984-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-09-05 | Perforation Treatment Performed - Jet Perforation |
| 1989-01-08 | Well Fluid changed to Crude Oil |
| 1989-01-08 | Well Mode changed to Suspended |
| 1993-09-03 | Well Log Performed |
| 2001-04-04 | Perforation Treatment Performed - Jet Perforation |
| 2001-04-04 | Well Fluid changed to Crude Oil |
| 2001-04-04 | Well Mode changed to Suspended |
| 2001-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-07-10 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2002-07-11 | Perforation Treatment Performed - Jet Perforation |
| 2002-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-07-12 | Plug Back Performed |
| 2002-07-12 | Well Fluid changed to Crude Oil |
| 2002-07-12 | Well Mode changed to Abandoned Zone |
| 2002-07-14 | Perforation Treatment Performed - Jet Perforation |
| 2002-07-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2019-09-05 | Well Log Performed |
| 2019-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-09-06 | Plug Back Performed |
| 2019-09-06 | Well Log Performed |
| 2019-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-09-07 | Perforation Treatment Performed - Jet Perforation |
| 2019-09-07 | Plug Back Performed |
| 2019-09-07 | Well Log Performed |
| 2019-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-09-08 | Perforation Treatment Performed - Cement Squeeze |
| 2019-09-08 | Perforation Treatment Performed - Jet Perforation |
| 2019-09-08 | Plug Back Performed |
| 2019-09-08 | Well Log Performed |
| 2019-10-28 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1948-11-29 | Bullet Perforation | 1610.90 | 1612.40 | 10 |
| 2001-04-06 | Acid Treatment | 1591.00 | 1593.50 | 0 |
| 2002-07-10 | Bridge Plug, No Cement | 1585.00 | 1586.00 | 0 |
| 2002-07-11 | Perforation | 1553.00 | 1554.50 | 17 |
| 2002-07-12 | Packing Device Capped w/Cement | 1537.00 | 1545.00 | 0 |
| 2002-07-14 | Perforation | 1316.00 | 1323.00 | 17 |
| 2002-07-14 | Perforation | 1328.00 | 1331.00 | 17 |
| 2002-07-16 | Acid Treatment | 1316.00 | 1323.00 | 0 |
| 2002-07-16 | Acid Treatment | 1328.00 | 1331.00 | 0 |
| 2019-09-06 | Packing Device Capped w/Cement | 1304.00 | 1312.00 | 0 |
| 2019-09-07 | Packing Device Capped w/Cement | 575.00 | 583.00 | 0 |
| 1948-12-02 | Acid Wash | 1610.90 | 1612.40 | 0 |
| 2019-09-07 | Perforation | 313.00 | 314.00 | 13 |
| 2019-09-07 | Packing Device Capped w/Cement | 300.00 | 308.00 | 0 |
| 2019-09-07 | Perforation | 200.00 | 201.00 | 13 |
| 2019-09-07 | Perforation | 105.00 | 106.00 | 13 |
| 2019-09-08 | Packing Device Capped w/Cement | 188.00 | 196.00 | 0 |
| 2019-09-08 | Perforation | 150.00 | 151.00 | 13 |
| 2019-09-08 | Cement Squeeze | 150.00 | 151.00 | 0 |
| 2019-09-08 | Packing Device Capped w/Cement | 142.00 | 150.00 | 0 |
| 2019-09-08 | Cement Squeeze | 105.00 | 106.00 | 0 |
| 2019-09-08 | Packing Device Capped w/Cement | 92.00 | 100.00 | 0 |
| 1984-08-23 | Acid Treatment | 1610.90 | 1612.40 | 0 |
| 1984-08-23 | Cement Squeeze | 1610.90 | 1612.40 | 0 |
| 1984-08-28 | Perforation | 1609.50 | 1609.60 | 3 |
| 1984-08-30 | Cement Squeeze | 1609.50 | 1609.60 | 0 |
| 1984-09-05 | Perforation | 1609.00 | 1609.10 | 3 |
| 1984-09-05 | Acid Treatment | 1609.00 | 1609.10 | 0 |
| 2001-04-04 | Perforation | 1591.00 | 1593.50 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 7707 | 0.0 | 0.0 | 0.0 |
| 1968 | 3676 | 0.0 | 0.0 | 0.0 |
| 1969 | 1164 | 0.0 | 0.0 | 0.0 |
| 1970 | 3719 | 0.0 | 0.0 | 0.0 |
| 1971 | 6272 | 0.0 | 0.0 | 0.0 |
| 1972 | 7342 | 0.0 | 0.0 | 0.0 |
| 1973 | 8476 | 0.0 | 0.0 | 0.0 |
| 1974 | 8469 | 0.0 | 0.0 | 0.0 |
| 1975 | 8341 | 0.0 | 0.0 | 0.0 |
| 1976 | 7434 | 0.0 | 0.0 | 0.0 |
| 1977 | 6960 | 0.0 | 0.0 | 0.0 |
| 1978 | 7995 | 0.0 | 0.0 | 0.0 |
| 1979 | 6187 | 0.0 | 0.0 | 0.0 |
| 1980 | 6975 | 0.0 | 0.0 | 0.0 |
| 1981 | 6353 | 0.0 | 0.0 | 0.0 |
| 1982 | 7499 | 0.0 | 0.0 | 0.0 |
| 1983 | 7688 | 0.0 | 0.0 | 0.0 |
| 1984 | 2892 | 0.0 | 0.0 | 0.0 |
| 1985 | 5712 | 0.0 | 0.0 | 0.0 |
| 1986 | 692 | 0.0 | 0.0 | 0.0 |
| 1987 | 5166 | 0.0 | 0.0 | 0.0 |
| 1988 | 6226 | 0.0 | 0.0 | 0.0 |
| 1989 | 168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-09-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]