If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504260905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.299543,"lon":-113.753587,"icon":""}]} |
Location: 00/05-09-050-26W4/0 | |
Location Alias: 00/05-09-50-26 W4M | |
Location Alias 2: 00/05-09-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 09 | |
County/Municipality: Leduc County | |
Well Name: HOME OIL LEDUC #15 | |
Operator Name: Devon Canada Corporation | |
License Number: B0002425 | |
License Date: 1948-10-23 | |
License Status: Re-Entered | |
Spud Date: 1948-11-12 | |
Final Drill Date: 1949-01-07 | |
Well Total Depth: 1644.40 m | |
Surface Hole Latitude: 53.299543 | |
Surface Hole Longitude: -113.753587 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-10-23 | Obtained License |
1948-12-17 | Drill Stem Test Performed |
1948-12-20 | Liner Casing Operation Performed |
1949-01-07 | Finished Drilling |
1949-01-07 | Perforation Treatment Performed - Open-Hole Completion |
1949-01-07 | Well Mode changed to Drilled and Cased |
1949-01-09 | Well Began Production |
1949-01-09 | Well Fluid changed to Crude Oil |
1949-01-09 | Well Mode changed to Pumping |
1954-07-21 | Perforation Treatment Performed - Jet Perforation |
1954-10-09 | Perforation Treatment Performed - Cement Squeeze |
1954-10-23 | Perforation Treatment Performed - Jet Perforation |
1954-10-25 | Perforation Treatment Performed - Jet Perforation |
1954-10-26 | Perforation Treatment Performed - Open-Hole Completion |
1954-10-27 | Perforation Treatment Performed - Jet Perforation |
1954-11-13 | Perforation Treatment Performed - Visqueeze |
1955-06-01 | Perforation Treatment Performed - Acid Wash - No Pressure |
1955-06-01 | Perforation Treatment Performed - Bullet Perforation |
1990-03-13 | Well Fluid changed to Crude Oil |
1990-03-13 | Well Mode changed to Suspended |
1992-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-07-12 | Plug Back Performed |
1992-07-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-07-15 | Perforation Treatment Performed - Jet Perforation |
1992-07-15 | Plug Back Performed |
1992-07-15 | Well Fluid changed to Crude Oil |
1992-07-15 | Well Mode changed to Abandoned |
1992-07-16 | Well Fluid changed to Crude Oil |
1992-07-16 | Well Mode changed to Abandoned and Re-entered |
1992-07-23 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-01-07 | Open Hole/Barefoot Completion | 1639.80 | 1642.90 | 0 |
1955-06-01 | Bullet Perforation | 1641.00 | 1642.60 | 13 |
1955-06-01 | Acid Wash | 1641.00 | 1642.60 | 0 |
1992-07-12 | Packing Device Capped w/Cement | 1615.00 | 1623.00 | 0 |
1992-07-15 | Packing Device Capped w/Cement | 1582.00 | 1590.00 | 0 |
1992-07-15 | Perforation | 160.00 | 160.50 | 7 |
1992-07-23 | Remedial Casing Cementing | 160.00 | 160.50 | 0 |
1954-07-21 | Perforation | 1638.90 | 1639.20 | 13 |
1954-10-09 | Cement Squeeze | 1638.90 | 1639.20 | 0 |
1954-10-23 | Perforation | 1641.00 | 1641.30 | 13 |
1954-10-25 | Perforation | 1641.30 | 1641.70 | 26 |
1954-10-26 | Open Hole/Barefoot Completion | 1639.80 | 1644.40 | 0 |
1954-10-27 | Perforation | 1642.00 | 1642.60 | 26 |
1954-11-13 | Visqueeze | 1642.00 | 1642.60 | 0 |
1955-06-01 | Bullet Perforation | 1641.70 | 1642.60 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 24 | 0.0 | 0.0 | 0.0 |
1974 | 3760 | 0.0 | 0.0 | 0.0 |
1975 | 3599 | 0.0 | 0.0 | 0.0 |
1976 | 6148 | 0.0 | 0.0 | 0.0 |
1977 | 5596 | 0.0 | 0.0 | 0.0 |
1978 | 8352 | 0.0 | 0.0 | 0.0 |
1979 | 8436 | 0.0 | 0.0 | 0.0 |
1980 | 8182 | 0.0 | 0.0 | 0.0 |
1981 | 7914 | 0.0 | 0.0 | 0.0 |
1982 | 8404 | 0.0 | 0.0 | 0.0 |
1983 | 8201 | 0.0 | 0.0 | 0.0 |
1984 | 8549 | 0.0 | 0.0 | 0.0 |
1985 | 5863 | 0.0 | 0.0 | 0.0 |
1986 | 6417 | 0.0 | 0.0 | 0.0 |
1987 | 8386 | 0.0 | 0.0 | 0.0 |
1988 | 8123 | 0.0 | 0.0 | 0.0 |
1989 | 7706 | 0.0 | 0.0 | 0.0 |
1990 | 1680 | 0.0 | 0.0 | 0.0 |
For data sources see[5]