X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260807000

Well Details

Well ID: 0504260807000
Loading map...
Location: 00/07-08-050-26W4/0
Location Alias: 00/07-08-50-26 W4M
Location Alias 2: 00/07-08-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 08
County/Municipality: Leduc County
Well Name: IMPERIAL HUDSON'S BAY LEDUC NO.255
Operator Name: Imperial Oil Resources Limited
License Number: 0001350
License Date: 1950-04-12
License Status: RecCertified
Spud Date: 1950-04-13
Final Drill Date: 1950-05-09
Well Total Depth: 1643.50 m
Surface Hole Latitude: 53.299531
Surface Hole Longitude: -113.765958

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-04-12 Obtained License
1950-05-02 Drill Stem Test Performed
1950-05-03 Drill Stem Test Performed
1950-05-06 Liner Casing Operation Performed
1950-05-09 Finished Drilling
1950-05-09 Perforation Treatment Performed - Open-Hole Completion
1950-05-09 Well Mode changed to Drilled and Cased
1950-05-12 Perforation Treatment Performed - Jet Perforation
1950-05-13 Well Began Production
1950-05-13 Well Fluid changed to Crude Oil
1950-05-13 Well Mode changed to Flowing
1974-05-08 Well Fluid changed to Crude Oil
1974-05-08 Well Mode changed to Pumping
1974-05-12 Well Fluid changed to Crude Oil
1974-05-12 Well Mode changed to Pumping
1975-06-19 Well Fluid changed to Crude Oil
1975-06-19 Well Mode changed to Flowing
1980-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-31 Perforation Treatment Performed - Cement Squeeze
1980-04-07 Perforation Treatment Performed - Jet Perforation
1980-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-10 Well Fluid changed to Crude Oil
1989-05-10 Well Mode changed to Suspended
1996-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-16 Perforation Treatment Performed - Jet Perforation
1996-08-16 Plug Back Performed
1996-08-16 Well Log Performed
1996-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-05 Perforation Treatment Performed - Remedial Casing
1996-09-09 Well Abandoned
1996-09-09 Well Fluid changed to Crude Oil
1996-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-05-09 Open Hole/Barefoot Completion 1624.00 1643.50 0
1996-09-05 Remedial Casing Cementing 160.00 161.00 0
1996-09-05 Packing Device Capped w/Cement 47.80 165.00 0
1950-05-12 Perforation 1639.80 1641.30 20
1980-03-29 Acid Treatment 1624.00 1643.50 0
1980-03-31 Cement Squeeze 1624.00 1643.50 0
1980-04-07 Perforation 1637.40 1638.20 7
1980-04-08 Acid Treatment 1637.40 1638.20 0
1996-08-16 Packing Device Capped w/Cement 1615.00 1623.00 0
1996-08-16 Packing Device Capped w/Cement 1279.00 1287.00 0
1996-08-16 Perforation 160.00 161.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1970 96 0.0 0.0 0.0
1971 3216 0.0 0.0 0.0
1972 6480 0.0 0.0 0.0
1973 4971 0.0 0.0 0.0
1974 3428 0.0 0.0 0.0
1975 8119 0.0 0.0 0.0
1976 7319 0.0 0.0 0.0
1977 3695 0.0 0.0 0.0
1980 6012 0.0 0.0 0.0
1981 8543 0.0 0.0 0.0
1982 8036 0.0 0.0 0.0
1983 8061 0.0 0.0 0.0
1984 8518 0.0 0.0 0.0
1985 7953 0.0 0.0 0.0
1986 6039 0.0 0.0 0.0
1987 3338 0.0 0.0 0.0
1988 8662 0.0 0.0 0.0
1989 2448 0.0 0.0 0.0

For data sources see[5]

References