X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260303000

Well Details

Well ID: 0504260303000
Loading map...
Location: 00/03-03-050-26W4/0
Location Alias: 00/03-03-50-26 W4M
Location Alias 2: 00/03-03-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 03
County/Municipality: Leduc County
Well Name: SAGE LEDUC 3-3-50-26
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0001773
License Date: 1950-07-21
License Status: Abandoned
Spud Date: 1950-08-02
Final Drill Date: 1950-09-03
Well Total Depth: 1652.00 m
Surface Hole Latitude: 53.281478
Surface Hole Longitude: -113.722246

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-07-21 Obtained License
1950-08-24 Drill Stem Test Performed
1950-08-26 Drill Stem Test Performed
1950-08-31 Production Casing Operation Performed
1950-09-03 Drill Stem Test Performed
1950-09-03 Finished Drilling
1950-09-03 Perforation Treatment Performed - Open-Hole Completion
1950-09-03 Well Mode changed to Drilled and Cased
1950-09-06 Well Began Production
1950-09-06 Well Fluid changed to Crude Oil
1950-09-06 Well Mode changed to Flowing
1951-10-02 Well Fluid changed to Crude Oil
1951-10-02 Well Mode changed to Pumping
1957-08-12 Perforation Treatment Performed - Bullet Perforation
1957-08-16 Perforation Treatment Performed - Acid Wash - No Pressure
1958-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-09-24 Well Fluid changed to Crude Oil
1958-09-24 Well Mode changed to Abandoned Zone
1958-09-25 Perforation Treatment Performed - Bullet Perforation
1958-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-27 Perforation Treatment Performed - Jet Perforation
1987-10-27 Well Log Performed
1987-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-02 Well Log Performed
1992-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-03-03 Plug Back Performed
1992-04-29 Perforation Treatment Performed - Jet Perforation
1992-05-13 Perforation Treatment Performed - Remedial Casing
1992-05-26 Perforation Treatment Performed - Cement Plug
1992-08-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-03 Open Hole/Barefoot Completion 1649.30 1652.00 0
1958-09-27 Acid Treatment 1562.10 1589.50 0
1958-12-01 Acid Treatment 1562.10 1589.50 0
1987-10-27 Perforation 1562.10 1564.40 13
1987-10-27 Perforation 1570.60 1572.80 13
1987-10-27 Perforation 1574.60 1589.60 13
1987-10-29 Acid Treatment 1562.10 1589.60 0
1992-03-03 Packing Device Capped w/Cement 1544.00 1552.00 0
1992-04-29 Perforation 160.00 160.50 13
1992-05-13 Remedial Casing Cementing 160.00 160.50 0
1992-05-26 Cement Plug 41.50 175.00 0
1957-08-12 Bullet Perforation 1650.50 1651.40 13
1957-08-16 Acid Wash 1649.30 1651.40 0
1958-09-24 Packing Device Capped w/Cement 1600.20 1600.20 0
1958-09-25 Bullet Perforation 1583.40 1585.00 7
1958-09-25 Bullet Perforation 1586.50 1589.50 7
1958-09-25 Bullet Perforation 1562.10 1565.10 7
1958-09-25 Bullet Perforation 1571.20 1572.80 7
1958-09-25 Bullet Perforation 1575.80 1578.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References