X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504250508000

Well Details

Well ID: 0504250508000
Loading map...
Location: 00/08-05-050-25W4/0
Location Alias: 00/08-05-50-25 W4M
Location Alias 2: 00/08-05-050-25 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 25
Section: 05
County/Municipality: Leduc County
Well Name: SAGE EAST LEDUC 8-5-50-25
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0002462
License Date: 1950-12-21
License Status: RecCertified
Spud Date: 1950-12-24
Final Drill Date: 1951-02-11
Well Total Depth: 1821.20 m
Surface Hole Latitude: 53.285233
Surface Hole Longitude: -113.613546

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-12-21 Obtained License
1951-01-10 Drill Stem Test Performed
1951-01-28 Drill Stem Test Performed
1951-02-05 Drill Stem Test Performed
1951-02-06 Drill Stem Test Performed
1951-02-07 Drill Stem Test Performed
1951-02-08 Drill Stem Test Performed
1951-02-09 Drill Stem Test Performed
1951-02-11 Finished Drilling
1951-02-11 Well Mode changed to Drilled and Cased
1951-02-13 Production Casing Operation Performed
1951-02-15 Perforation Treatment Performed - Jet Perforation
1951-02-16 Perforation Treatment Performed - Cement Squeeze
1951-02-17 Drill Stem Test Performed
1951-02-18 Perforation Treatment Performed - Bullet Perforation
1951-02-18 Perforation Treatment Performed - Cement Squeeze
1951-02-20 Drill Stem Test Performed
1951-02-21 Perforation Treatment Performed - Jet Perforation
1951-02-23 Well Began Production
1951-02-23 Well Fluid changed to Crude Oil
1951-02-23 Well Mode changed to Flowing
1954-03-10 Well Fluid changed to Crude Oil
1954-03-10 Well Mode changed to Suspended
1960-05-07 Perforation Treatment Performed - Jet Perforation
1960-05-10 Perforation Treatment Performed - Jet Perforation
1960-05-27 Perforation Treatment Performed - Acid Wash - No Pressure
1960-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-26 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-29 Perforation Treatment Performed - Cement Squeeze
1961-02-07 Well Fluid changed to Crude Oil
1961-02-07 Well Mode changed to Flowing
1961-02-14 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-02-15 Perforation Treatment Performed - Cement Squeeze
1961-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-06 Perforation Treatment Performed - Acid Wash - No Pressure
1961-03-06 Perforation Treatment Performed - Jet Perforation
1961-04-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-04-21 Perforation Treatment Performed - Cement Squeeze
1961-04-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-30 Perforation Treatment Performed - Cement Squeeze
1961-05-31 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-12 Perforation Treatment Performed - Visqueeze
1961-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-10-02 Well Fluid changed to Crude Oil
1961-10-02 Well Mode changed to Pumping
1970-04-29 Perforation Treatment Performed - Cement Plug
1970-05-04 Well Abandoned
1970-05-04 Well Fluid changed to Crude Oil
1970-05-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-02-15 Perforation 1763.00 1763.30 26
1960-06-08 Acid Treatment 1760.80 1761.70 0
1961-01-26 Hydra Jet Perforation 1768.80 1768.80 0
1961-01-27 Acid Treatment 1768.80 1768.80 0
1961-01-29 Cement Squeeze 1768.80 1768.80 0
1961-02-14 Hydra Jet Perforation 1763.60 1763.60 0
1961-02-15 Cement Squeeze 1762.70 1763.60 0
1961-02-18 Acid Treatment 1760.80 1761.70 0
1961-03-06 Perforation 1760.80 1761.70 13
1961-03-06 Acid Wash 1760.80 1761.70 0
1961-04-20 Hydra Jet Perforation 1762.00 1762.00 0
1951-02-15 Perforation 1763.90 1764.50 13
1961-04-21 Cement Squeeze 1762.00 1762.00 0
1961-04-22 Hydra Jet Perforation 1761.10 1761.10 0
1961-04-24 Acid Treatment 1761.10 1761.70 0
1961-05-30 Cement Squeeze 1761.10 1761.70 0
1961-05-31 Hydra Jet Perforation 1760.80 1760.80 0
1961-05-31 Acid Treatment 1760.80 1760.80 0
1961-06-01 Acid Treatment 1760.80 1760.80 0
1961-06-06 Acid Treatment 1760.80 1760.80 0
1961-06-07 Acid Treatment 1760.80 1760.80 0
1961-06-12 Visqueeze 1760.80 1760.80 0
1951-02-16 Cement Squeeze 1763.00 1764.50 0
1961-06-13 Acid Treatment 1760.80 1760.80 0
1961-06-14 Acid Treatment 1760.80 1760.80 0
1961-06-16 Acid Treatment 1760.80 1760.80 0
1961-06-26 Acid Treatment 1760.80 1760.80 0
1961-06-27 Acid Treatment 1760.80 1760.80 0
1961-06-28 Acid Treatment 1760.80 1760.80 0
1961-06-30 Acid Treatment 1760.80 1760.80 0
1961-09-25 Acid Treatment 1760.80 1760.80 0
1970-04-29 Cement Plug 1725.20 1761.70 0
1951-02-18 Bullet Perforation 1763.30 1764.50 3
1951-02-18 Cement Squeeze 1763.30 1764.50 0
1951-02-21 Perforation 1762.70 1762.70 13
1960-05-07 Perforation 1760.80 1761.70 13
1960-05-10 Perforation 1761.40 1761.70 7
1960-05-27 Acid Wash 1761.40 1761.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0

For data sources see[5]

References