X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504220104000

Well Details

Well ID: 0504220104000
Loading map...
Location: 00/04-01-050-22W4/0
Location Alias: 00/04-01-50-22 W4M
Location Alias 2: 00/04-01-050-22 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 22
Section: 01
County/Municipality: Leduc County
Well Name: SUPERTEST JOARCAM 4-1-50-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0015105
License Date: 1958-04-25
License Status: RecCertified
Spud Date: 1958-04-28
Final Drill Date: 1958-05-08
Well Total Depth: 1031.70 m
Surface Hole Latitude: 53.282266
Surface Hole Longitude: -113.094034

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-04-25 Obtained License
1958-04-28 Direction Drilling Operation Performed - 98
1958-05-08 Finished Drilling
1958-05-08 Well Mode changed to Drilled and Cased
1958-05-09 Production Casing Operation Performed
1958-05-13 Perforation Treatment Performed - Jet Perforation
1958-06-01 Well Began Production
1958-06-01 Well Fluid changed to Crude Oil
1958-06-01 Well Mode changed to Pumping
1995-06-01 Well Fluid changed to Crude Oil
1995-06-01 Well Mode changed to Suspended
1998-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-14 Perforation Treatment Performed - Cement Plug
1998-08-14 Perforation Treatment Performed - Jet Perforation
1998-08-14 Perforation Treatment Performed - Remedial Casing
1998-08-14 Plug Back Performed
1998-08-14 Well Fluid changed to Crude Oil
1998-08-14 Well Log Performed
1998-08-14 Well Mode changed to Abandoned Zone
1998-08-19 Well Log Performed
1998-08-24 Well Abandoned
1998-08-24 Well Fluid changed to Crude Oil
1998-08-24 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1958-04-28 732.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-05-13 Perforation 994.60 995.50 13
1998-08-14 Packing Device Capped w/Cement 978.00 987.00 0
1998-08-14 Perforation 163.50 164.50 13
1998-08-14 Remedial Casing Cementing 163.50 164.50 0
1998-08-14 Cement Plug 122.00 164.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6912 0.0 0.0 0.0
1968 7951 0.0 0.0 0.0
1969 6720 0.0 0.0 0.0
1970 5136 0.0 0.0 0.0
1971 4960 0.0 0.0 0.0
1972 6564 0.0 0.0 0.0
1973 8184 0.0 0.0 0.0
1974 8083 0.0 0.0 0.0
1975 8364 0.0 0.0 0.0
1976 8485 0.0 0.0 0.0
1977 8503 0.0 0.0 0.0
1978 6521 0.0 0.0 0.0
1979 7546 0.0 0.0 0.0
1980 8239 0.0 0.0 0.0
1981 8690 0.0 0.0 0.0
1982 8502 0.0 0.0 0.0
1983 8553 0.0 0.0 0.0
1984 8739 0.0 0.0 0.0
1985 8221 0.0 0.0 0.0
1986 8615 0.0 0.0 0.0
1987 8014 0.0 0.0 0.0
1988 8116 0.0 0.0 0.0
1989 8595 0.0 0.0 0.0
1990 8594 0.0 0.0 0.0
1991 8708 0.0 0.0 0.0
1992 8572 0.0 0.0 0.0
1993 7132 0.0 0.0 0.0
1994 6140 0.0 0.0 0.0
1995 474 0.0 0.0 0.0

For data sources see[6]

References