If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504182916003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.34925,"lon":-112.592954,"icon":""}]} |
Location: 00/16-29-050-18W4/3 | |
Location Alias: 00/16-29-50-18 W4M | |
Location Alias 2: 00/16-29-050-18 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 18 | |
Section: 29 | |
County/Municipality: Beaver County | |
Well Name: PINE CLIFF BVHL 16-29-50-18 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0102760 | |
License Date: 1983-08-16 | |
License Status: Suspension | |
Spud Date: 1983-08-24 | |
Final Drill Date: 1983-08-28 | |
Well Total Depth: 985.00 m | |
Surface Hole Latitude: 53.349250 | |
Surface Hole Longitude: -112.592954 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-08-16 | Obtained License |
1983-08-28 | Drill Stem Test Performed |
1983-08-28 | Finished Drilling |
1983-08-28 | Well Log Performed |
1983-08-28 | Well Mode changed to Drilled and Cased |
1983-08-29 | Drill Stem Test Performed |
1983-08-30 | Drill Stem Test Performed |
1983-08-31 | Production Casing Operation Performed |
1983-11-03 | Perforation Treatment Performed - Jet Perforation |
1983-11-04 | Perforation Treatment Performed - Jet Perforation |
1990-10-09 | Well Log Performed |
1990-10-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-10-10 | Plug Back Performed |
1990-10-11 | Perforation Treatment Performed - Jet Perforation |
1990-10-13 | Well Log Performed |
1990-10-14 | Perforation Treatment Performed - Jet Perforation |
1990-10-16 | Well Began Production |
1990-10-16 | Well Fluid changed to Gas |
1990-10-16 | Well Mode changed to Flowing |
1994-04-04 | Perforation Treatment Performed - Jet Perforation |
1994-04-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-04-06 | Perforation Treatment Performed - Jet Perforation |
1994-04-06 | Plug Back Performed |
1994-04-08 | Well Fluid changed to Gas |
1994-04-08 | Well Mode changed to Flowing |
1994-06-18 | Perforation Treatment Performed - Fractured |
1999-03-01 | Well Fluid changed to Gas |
1999-03-01 | Well Mode changed to Suspended |
2001-03-13 | Well Fluid changed to Gas |
2001-03-13 | Well Mode changed to Flowing |
2010-10-01 | Well Fluid changed to Gas |
2010-10-01 | Well Mode changed to Suspended |
2011-05-04 | Well Fluid changed to Gas |
2011-05-04 | Well Mode changed to Flowing |
2014-09-01 | Well Fluid changed to Gas |
2014-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-11-03 | Perforation | 928.50 | 930.00 | 13 |
1994-04-06 | Perforation | 845.00 | 849.00 | 13 |
1994-06-18 | Fracture | 845.00 | 849.00 | 0 |
1983-11-04 | Perforation | 928.20 | 930.80 | 13 |
1983-11-04 | Perforation | 912.00 | 913.50 | 13 |
1990-10-10 | Packing Device Capped w/Cement | 923.00 | 926.00 | 0 |
1990-10-11 | Perforation | 916.00 | 917.50 | 13 |
1990-10-14 | Perforation | 917.50 | 918.50 | 13 |
1990-10-14 | Perforation | 810.00 | 812.00 | 13 |
1994-04-04 | Perforation | 912.00 | 913.50 | 13 |
1994-04-06 | Packing Device Capped w/Cement | 902.00 | 910.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 716 | 0.0 | 0.0 | 0.0 |
1991 | 6276 | 0.0 | 0.0 | 0.0 |
1992 | 8409 | 0.0 | 0.0 | 0.0 |
1993 | 5055 | 0.0 | 0.0 | 0.0 |
1994 | 2916 | 0.0 | 0.0 | 0.0 |
1995 | 3747 | 0.0 | 0.0 | 0.0 |
1997 | 3448 | 0.0 | 0.0 | 0.0 |
1998 | 7947 | 0.0 | 0.0 | 0.0 |
1999 | 74 | 0.0 | 0.0 | 0.0 |
2001 | 6693 | 0.0 | 0.0 | 0.0 |
2002 | 8555 | 0.0 | 0.0 | 0.0 |
2003 | 8462 | 0.0 | 0.0 | 0.0 |
2004 | 8559 | 0.0 | 0.0 | 0.0 |
2005 | 8036 | 0.0 | 0.0 | 0.0 |
2006 | 8592 | 0.0 | 0.0 | 0.0 |
2007 | 8581 | 0.0 | 0.0 | 0.0 |
2008 | 8724 | 0.0 | 0.0 | 0.0 |
2009 | 8668 | 0.0 | 0.0 | 0.0 |
2010 | 6017 | 0.0 | 0.0 | 0.0 |
2011 | 5135 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 676 | 0.0 | 0.0 | 0.0 |
For data sources see[5]