X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504182916000

Well Details

Well ID: 0504182916000
Loading map...
Location: 00/16-29-050-18W4/0
Location Alias: 00/16-29-50-18 W4M
Location Alias 2: 00/16-29-050-18 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 18
Section: 29
County/Municipality: Beaver County
Well Name: PINE CLIFF BVHL 16-29-50-18
Operator Name: Pine Cliff Energy Ltd.
License Number: 0102760
License Date: 1983-08-16
License Status: Suspension
Spud Date: 1983-08-24
Final Drill Date: 1983-08-28
Well Total Depth: 985.00 m
Surface Hole Latitude: 53.349250
Surface Hole Longitude: -112.592954

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-16 Obtained License
1983-08-28 Drill Stem Test Performed
1983-08-28 Finished Drilling
1983-08-28 Well Log Performed
1983-08-29 Drill Stem Test Performed
1983-08-30 Drill Stem Test Performed
1983-08-31 Production Casing Operation Performed
1983-08-31 Well Mode changed to Drilled and Cased
1983-11-03 Perforation Treatment Performed - Jet Perforation
1983-11-04 Perforation Treatment Performed - Jet Perforation
1983-11-04 Well Mode changed to Drilled and Cased
1984-01-01 Well Began Production
1984-01-01 Well Fluid changed to Gas
1984-01-01 Well Mode changed to Flowing
1986-11-10 Well Fluid changed to Gas
1986-11-10 Well Mode changed to Suspended
1989-09-01 Well Fluid changed to Gas
1989-09-01 Well Mode changed to Flowing
1990-10-01 Well Fluid changed to Gas
1990-10-01 Well Mode changed to Suspended
1990-10-09 Well Log Performed
1990-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-10 Plug Back Performed
1990-10-10 Well Fluid changed to Gas
1990-10-10 Well Mode changed to Abandoned Zone
1990-10-11 Perforation Treatment Performed - Jet Perforation
1990-10-13 Well Log Performed
1990-10-14 Perforation Treatment Performed - Jet Perforation
1994-04-04 Perforation Treatment Performed - Jet Perforation
1994-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-06 Perforation Treatment Performed - Jet Perforation
1994-04-06 Plug Back Performed
1994-06-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-03 Perforation 928.50 930.00 13
1994-04-06 Perforation 845.00 849.00 13
1994-06-18 Fracture 845.00 849.00 0
1983-11-04 Perforation 928.20 930.80 13
1983-11-04 Perforation 912.00 913.50 13
1990-10-10 Packing Device Capped w/Cement 923.00 926.00 0
1990-10-11 Perforation 916.00 917.50 13
1990-10-14 Perforation 917.50 918.50 13
1990-10-14 Perforation 810.00 812.00 13
1994-04-04 Perforation 912.00 913.50 13
1994-04-06 Packing Device Capped w/Cement 902.00 910.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 8150 0.0 0.0 0.0
1985 6580 0.0 0.0 0.0
1986 6681 0.0 0.0 0.0
1989 2120 0.0 0.0 0.0
1990 4040 0.0 0.0 0.0

For data sources see[5]

References