X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504161706002

Well Details

Well ID: 0504161706002
Loading map...
Location: 00/06-17-050-16W4/2
Location Alias: 00/06-17-50-16 W4M
Location Alias 2: 00/06-17-050-16 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 16
Section: 17
County/Municipality: Beaver County
Well Name: NNR BRUCE 6-17-50-16
Operator Name: New North Resources Ltd.
License Number: 0076867
License Date: 1979-07-12
License Status: Suspension
Spud Date: 1979-08-29
Final Drill Date: 1979-09-02
Well Total Depth: 985.00 m
Surface Hole Latitude: 53.312811
Surface Hole Longitude: -112.312692

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-12 Obtained License
1979-09-02 Finished Drilling
1979-09-02 Well Mode changed to Drilled and Cased
1979-09-03 Drill Stem Test Performed
1979-09-04 Drill Stem Test Performed
1979-09-05 Production Casing Operation Performed
1979-11-29 Perforation Treatment Performed - Jet Perforation
1979-11-30 Perforation Treatment Performed - Fractured
1995-11-02 Perforation Treatment Performed - Jet Perforation
1996-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-17 Plug Back Performed
1996-05-18 Perforation Treatment Performed - Jet Perforation
1996-05-20 Well Began Production
1996-05-20 Well Fluid changed to Gas
1996-05-20 Well Mode changed to Flowing
1996-11-17 Well Fluid changed to Gas
1996-11-17 Well Mode changed to Flowing
2000-06-01 Well Fluid changed to Gas
2000-06-01 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Suspended
2003-02-13 Well Fluid changed to Gas
2003-02-13 Well Mode changed to Flowing
2003-08-10 Perforation Treatment Performed - Jet Perforation
2003-08-11 Well Fluid changed to Gas
2003-08-11 Well Mode changed to Flowing
2003-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-29 Plug Back Performed
2009-02-01 Well Fluid changed to Gas
2009-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-29 Perforation 727.00 729.00 13
1979-11-30 Fracture 727.00 729.00 0
1995-11-02 Perforation 865.00 866.30 13
1996-05-17 Packing Device Capped w/Cement 847.00 855.00 0
1996-05-18 Perforation 761.00 761.80 13
2003-08-10 Perforation 865.00 866.30 13
2003-11-29 Packing Device Capped w/Cement 850.00 858.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 4853 0.0 0.0 0.0
2001 576 0.0 0.0 0.0
2003 7212 0.0 0.0 0.0
2004 8596 0.0 0.0 0.0
2005 8616 0.0 0.0 0.0
2006 7232 0.0 0.0 0.0
2007 6316 0.0 0.0 0.0
2008 3728 0.0 0.0 0.0
2009 673 0.0 0.0 0.0

For data sources see[5]

References