X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504093410000

Well Details

Well ID: 0504093410000
Loading map...
Location: 00/10-34-050-09W4/0
Location Alias: 00/10-34-50-09 W4M
Location Alias 2: 00/10-34-050-09 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 09
Section: 34
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 10-34-50-9
Operator Name: Perpetual Operating Corp.
License Number: 0040998
License Date: 1971-10-05
License Status: Suspension
Spud Date: 1971-10-15
Final Drill Date: 1971-10-18
Well Total Depth: 673.60 m
Surface Hole Latitude: 53.360795
Surface Hole Longitude: -111.231422

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-10-05 Obtained License
1971-10-18 Drill Stem Test Performed
1971-10-18 Finished Drilling
1971-10-18 Well Mode changed to Drilled and Cased
1971-10-20 Production Casing Operation Performed
1971-11-02 Perforation Treatment Performed - Jet Perforation
1971-11-10 Well Began Production
1971-11-10 Well Fluid changed to Crude Oil
1971-11-10 Well Mode changed to Pumping
1972-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-05-17 Perforation Treatment Performed - Jet Perforation
1972-05-17 Well Fluid changed to Crude Oil
1972-05-17 Well Mode changed to Abandoned Zone
1996-12-15 Well Log Performed
1996-12-20 Perforation Treatment Performed - Jet Perforation
1996-12-23 Well Log Performed
1996-12-29 Perforation Treatment Performed - Jet Perforation
1997-06-03 Well Log Performed
1997-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-04 Plug Back Performed
1997-06-05 Perforation Treatment Performed - Jet Perforation
1997-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-07 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-11-02 Perforation 617.80 620.90 13
1997-06-05 Perforation 589.50 590.90 13
1997-06-07 Packing Device Capped w/Cement 606.00 613.00 0
1997-06-07 Packing Device Capped w/Cement 580.10 588.10 0
1972-05-17 Packing Device Capped w/Cement 611.10 611.10 0
1972-05-17 Perforation 573.30 574.50 13
1972-05-17 Perforation 529.10 530.00 7
1972-05-17 Perforation 530.70 531.90 7
1972-05-17 Perforation 533.10 534.30 7
1996-12-20 Perforation 617.80 620.90 13
1996-12-29 Perforation 647.90 649.50 13
1997-06-04 Packing Device Capped w/Cement 639.00 647.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 1241 0.0 0.0 0.0
1972 3120 0.0 0.0 0.0

For data sources see[5]

References