X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504093310003

Well Details

Well ID: 0504093310003
Loading map...
Location: 00/10-33-050-09W4/3
Location Alias: 00/10-33-50-09 W4M
Location Alias 2: 00/10-33-050-09 W4/03
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 09
Section: 33
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 10-33-50-9
Operator Name: Perpetual Operating Corp.
License Number: 0059930
License Date: 1976-08-26
License Status: Abandoned
Spud Date: 1976-10-08
Final Drill Date: 1976-10-16
Well Total Depth: 685.80 m
Surface Hole Latitude: 53.358875
Surface Hole Longitude: -111.259930

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-26 Obtained License
1976-10-15 Drill Stem Test Performed
1976-10-16 Finished Drilling
1976-10-16 Well Mode changed to Drilled and Cased
1976-10-17 Drill Stem Test Performed
1976-10-18 Drill Stem Test Performed
1976-10-19 Drill Stem Test Performed
1976-10-20 Drill Stem Test Performed
1976-10-20 Production Casing Operation Performed
1976-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-18 Perforation Treatment Performed - Cement Squeeze
1976-12-18 Perforation Treatment Performed - Jet Perforation
1976-12-21 Perforation Treatment Performed - Jet Perforation
1996-12-02 Well Log Performed
1996-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-05 Plug Back Performed
1996-12-07 Perforation Treatment Performed - Cement Squeeze
1996-12-07 Plug Back Performed
1996-12-09 Well Log Performed
1996-12-10 Perforation Treatment Performed - Jet Perforation
1996-12-10 Well Log Performed
1996-12-11 Perforation Treatment Performed - Jet Perforation
1997-06-16 Well Log Performed
1997-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-17 Perforation Treatment Performed - Jet Perforation
1997-06-17 Plug Back Performed
1997-06-24 Well Began Production
1997-06-24 Well Fluid changed to Crude Oil
1997-06-24 Well Mode changed to Pumping
1998-03-23 Well Fluid changed to Crude Oil
1998-03-23 Well Mode changed to Abandoned Zone
1998-03-24 Well Log Performed
1998-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-25 Perforation Treatment Performed - Jet Perforation
1998-03-25 Plug Back Performed
1998-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-23 Perforation Treatment Performed - Jet Perforation
1998-11-23 Plug Back Performed
1998-11-23 Well Log Performed
1998-11-24 Perforation Treatment Performed - Cement Plug
1998-11-24 Perforation Treatment Performed - Remedial Casing
1998-11-28 Well Abandoned
1998-11-28 Well Fluid changed to Crude Oil
1998-11-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-12-18 Perforation 652.30 652.90 7
1996-12-07 Cement Squeeze 539.50 546.80 0
1996-12-10 Perforation 624.10 625.40 18
1996-12-11 Perforation 612.30 613.20 18
1997-06-17 Packing Device Capped w/Cement 620.00 622.00 0
1997-06-17 Perforation 612.30 613.20 20
1998-03-25 Packing Device Capped w/Cement 592.00 600.00 0
1998-03-25 Packing Device Capped w/Cement 527.00 535.00 0
1998-03-25 Perforation 514.00 516.00 20
1998-03-25 Perforation 506.00 509.50 20
1998-03-25 Perforation 499.30 503.50 20
1976-12-18 Perforation 660.80 661.70 7
1998-11-23 Packing Device Capped w/Cement 480.00 488.00 0
1998-11-23 Perforation 159.00 160.00 13
1998-11-24 Remedial Casing Cementing 159.00 160.00 0
1998-11-24 Cement Plug 128.50 160.00 0
1976-12-18 Acid Treatment 652.30 661.70 0
1976-12-18 Cement Squeeze 652.30 661.70 0
1976-12-21 Perforation 654.10 655.90 7
1976-12-21 Perforation 657.80 658.40 7
1976-12-21 Perforation 539.50 541.30 7
1976-12-21 Perforation 545.60 546.80 7
1996-12-05 Packing Device Capped w/Cement 644.50 650.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 96 0.0 0.0 0.0
1997 1100 0.0 0.0 0.0

For data sources see[5]

References