If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504082215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.334224,"lon":-111.089192,"icon":""}]} |
Location: 00/15-22-050-08W4/0 | |
Location Alias: 00/15-22-50-08 W4M | |
Location Alias 2: 00/15-22-050-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 08 | |
Section: 22 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: POC MANN 15-22-50-8 | |
Operator Name: Perpetual Operating Corp. | |
License Number: 0328468 | |
License Date: 2005-03-23 | |
License Status: RecCertified | |
Spud Date: 2005-03-27 | |
Final Drill Date: 2005-03-29 | |
Well Total Depth: 689.00 m | |
Surface Hole Latitude: 53.334224 | |
Surface Hole Longitude: -111.089192 |
Date | Event |
---|---|
2005-03-23 | Obtained License |
2005-03-27 | Well Log Performed |
2005-03-28 | Surface Casing Operation Performed |
2005-03-29 | Finished Drilling |
2005-03-29 | Well Log Performed |
2005-03-29 | Well Mode changed to Drilled and Cased |
2005-03-30 | Production Casing Operation Performed |
2005-03-30 | Rig Released |
2005-04-08 | Perforation Treatment Performed - Jet Perforation |
2005-04-08 | Well Log Performed |
2005-06-01 | Well Began Production |
2005-06-01 | Well Fluid changed to Crude Oil |
2005-06-01 | Well Mode changed to Pumping |
2005-07-10 | Well Fluid changed to Crude Oil |
2005-07-10 | Well Mode changed to Suspended |
2006-03-15 | Well Log Performed |
2006-07-21 | Well Log Performed |
2006-07-22 | Well Log Performed |
2006-12-10 | Well Log Performed |
2007-01-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-11 | Plug Back Performed |
2007-01-11 | Well Fluid changed to Crude Oil |
2007-01-11 | Well Mode changed to Abandoned Zone |
2007-01-12 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2007-01-13 | Perforation Treatment Performed - Cement Plug |
2007-01-13 | Perforation Treatment Performed - Remedial Casing |
2007-03-17 | Well Abandoned |
2007-03-17 | Well Fluid changed to Crude Oil |
2007-03-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-04-08 | Perforation | 580.50 | 585.00 | 17 |
2007-01-11 | Packing Device Capped w/Cement | 566.00 | 574.00 | 0 |
2007-01-12 | Hydra Jet Perforation | 316.00 | 321.00 | 1 |
2007-01-13 | Remedial Casing Cementing | 316.00 | 321.00 | 0 |
2007-01-13 | Cement Plug | 292.00 | 336.00 | 0 |
For data sources see[4]