X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504063007002

Well Details

Well ID: 0504063007002
Loading map...
Location: 00/07-30-050-06W4/2
Location Alias: 00/07-30-50-06 W4M
Location Alias 2: 00/07-30-050-06 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 06
Section: 30
County/Municipality: County of Vermilion River
Well Name: CNRL WILDMERE 7-30-50-6
Operator Name: Canadian Natural Resources Limited
License Number: 0055687
License Date: 1975-11-04
License Status: Suspension
Spud Date: 1975-11-22
Final Drill Date: 1975-11-24
Well Total Depth: 582.50 m
Surface Hole Latitude: 53.340498
Surface Hole Longitude: -110.866610

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-04 Obtained License
1975-11-24 Finished Drilling
1975-11-25 Drill Stem Test Performed
1975-11-27 Drill Stem Test Performed
1975-11-27 Production Casing Operation Performed
1976-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-01 Perforation Treatment Performed - Jet Perforation
1976-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-03 Perforation Treatment Performed - Jet Perforation
1976-06-04 Perforation Treatment Performed - Jet Perforation
1976-06-10 Well Mode changed to Drilled and Cased
2004-03-08 Well Log Performed
2004-03-09 Well Log Performed
2008-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-15 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2008-03-15 Plug Back Performed
2008-03-15 Well Log Performed
2008-03-16 Well Log Performed
2008-03-17 Perforation Treatment Performed - Jet Perforation
2008-03-18 Perforation Treatment Performed - Jet Perforation
2008-03-18 Well Log Performed
2008-03-19 Well Log Performed
2008-03-20 Perforation Treatment Performed - Remedial Casing
2008-03-21 Perforation Treatment Performed - Jet Perforation
2008-03-27 Perforation Treatment Performed - Remedial Casing
2008-04-02 Perforation Treatment Performed - Jet Perforation
2008-04-02 Well Log Performed
2008-06-05 Well Began Production
2008-06-05 Well Fluid changed to Gas
2008-06-05 Well Mode changed to Flowing
2008-07-01 Well Fluid changed to Gas
2008-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-01 Perforation 553.80 554.40 7
2008-03-17 Perforation 433.50 434.50 13
2008-03-18 Perforation 433.50 433.80 99
2008-03-20 Remedial Casing Cementing 433.50 497.00 0
2008-03-21 Perforation 224.00 225.00 20
2008-03-27 Remedial Casing Cementing 224.00 225.00 0
2008-04-02 Perforation 505.10 505.70 17
1976-06-01 Acid Treatment 553.80 554.40 0
1976-06-03 Perforation 547.70 548.30 7
1976-06-03 Acid Treatment 547.70 548.30 0
1976-06-04 Perforation 505.10 505.70 7
2008-03-15 Packing Dev Cpd w/Res-Gyp Cem 548.90 551.90 0
2008-03-15 Packing Device Capped w/Cement 537.00 545.00 0
2008-03-17 Perforation 495.50 496.50 99
2008-03-17 Perforation 496.00 497.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 289 0.0 0.0 0.0

For data sources see[5]

References