If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504052912B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.344665,"lon":-110.710662,"icon":""}]} |
| Location: B0/12-29-050-05W4/0 | |
| Location Alias: B0/12-29-50-05 W4M | |
| Location Alias 2: B0/12-29-050-05 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 05 | |
| Section: 29 | |
| County/Municipality: County of Vermilion River | |
| Well Name: FLOBELL NO. 1 | |
| Operator Name: Vermilion Consolidated Oils Limited | |
| License Number: B0000277 | |
| License Date: 1942-01-06 | |
| License Status: RecExempt | |
| Spud Date: 1942-01-19 | |
| Final Drill Date: 1942-02-18 | |
| Well Total Depth: 554.70 m | |
| Surface Hole Latitude: 53.344665 | |
| Surface Hole Longitude: -110.710662 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1942-01-06 | Obtained License |
| 1942-02-18 | Finished Drilling |
| 1942-02-18 | Well Mode changed to Drilled and Cased |
| 1942-02-20 | Perforation Treatment Performed - Open-Hole Completion |
| 1942-02-20 | Production Casing Operation Performed |
| 1942-06-21 | Well Began Production |
| 1942-06-21 | Well Fluid changed to Crude Oil |
| 1942-06-21 | Well Mode changed to Pumping |
| 1944-02-07 | Perforation Treatment Performed - Cement Plug |
| 1944-02-07 | Well Fluid changed to Crude Oil |
| 1944-02-07 | Well Mode changed to Suspended |
| 1952-12-02 | Well Abandoned |
| 1952-12-02 | Well Fluid changed to Crude Oil |
| 1952-12-02 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1942-02-20 | Open Hole/Barefoot Completion | 554.10 | 554.70 | 0 |
| 1944-02-07 | Cement Plug | 551.70 | 554.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]