If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504042210030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.333807,"lon":-110.49807,"icon":""}]} |
| Location: 03/10-22-050-04W4/0 | |
| Location Alias: 03/10-22-50-04 W4M | |
| Location Alias 2: 03/10-22-050-04 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 04 | |
| Section: 22 | |
| County/Municipality: County of Vermilion River | |
| Well Name: CNRL LLOYD 10-22-50-4 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0431909 | |
| License Date: 2011-02-28 | |
| License Status: Abandoned | |
| Spud Date: 2011-03-19 | |
| Final Drill Date: 2011-03-21 | |
| Well Total Depth: 842.00 m | |
| Surface Hole Latitude: 53.333807 | |
| Surface Hole Longitude: -110.498070 |
| Date | Event |
|---|---|
| 2011-02-28 | Obtained License |
| 2011-03-19 | Direction Drilling Operation Performed - Deviate |
| 2011-03-20 | Surface Casing Operation Performed |
| 2011-03-21 | Finished Drilling |
| 2011-03-21 | Well Mode changed to Drilled and Cased |
| 2011-03-22 | Production Casing Operation Performed |
| 2011-03-22 | Rig Released |
| 2011-03-22 | Well Log Performed |
| 2011-06-02 | Perforation Treatment Performed - Jet Perforation |
| 2011-06-02 | Well Log Performed |
| 2011-06-03 | Well Began Production |
| 2011-06-03 | Well Fluid changed to Crude Oil |
| 2011-06-03 | Well Mode changed to Pumping |
| 2014-03-31 | Well Fluid changed to Crude Oil |
| 2014-03-31 | Well Mode changed to Suspended |
| 2014-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-11-03 | Plug Back Performed |
| 2014-11-03 | Well Fluid changed to Crude Oil |
| 2014-11-03 | Well Mode changed to Abandoned Zone |
| 2015-08-28 | Well Log Performed |
| 2015-09-28 | Perforation Treatment Performed - Jet Perforation |
| 2015-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-09-29 | Perforation Treatment Performed - Remedial Casing |
| 2016-01-16 | Perforation Treatment Performed - Jet Perforation |
| 2016-01-16 | Well Log Performed |
| 2016-01-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-01-20 | Perforation Treatment Performed - Remedial Casing |
| 2016-06-26 | Well Log Performed |
| 2016-10-04 | Perforation Treatment Performed - Jet Perforation |
| 2016-10-04 | Well Log Performed |
| 2016-10-07 | Perforation Treatment Performed - Cement Plug |
| 2016-10-07 | Perforation Treatment Performed - Remedial Casing |
| 2017-06-04 | Well Log Performed |
| 2017-06-06 | Perforation Treatment Performed - Jet Perforation |
| 2017-06-09 | Perforation Treatment Performed - Cement Plug |
| 2017-06-09 | Perforation Treatment Performed - Remedial Casing |
| 2017-06-16 | Well Abandoned |
| 2017-06-16 | Well Fluid changed to Crude Oil |
| 2017-06-16 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-03-19 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-06-02 | Perforation | 725.50 | 728.50 | 26 |
| 2016-10-07 | Remedial Casing Cementing | 286.50 | 287.80 | 0 |
| 2016-10-07 | Cement Plug | 265.00 | 281.00 | 0 |
| 2017-06-06 | Perforation | 231.00 | 232.30 | 13 |
| 2017-06-09 | Remedial Casing Cementing | 231.00 | 232.30 | 0 |
| 2017-06-09 | Cement Plug | 211.60 | 224.60 | 0 |
| 2014-11-03 | Packing Device Capped w/Cement | 697.50 | 715.50 | 0 |
| 2015-09-28 | Perforation | 478.00 | 480.00 | 20 |
| 2015-09-29 | Remedial Casing Cementing | 478.00 | 480.00 | 0 |
| 2015-09-29 | Packing Device Capped w/Cement | 454.50 | 469.50 | 0 |
| 2016-01-16 | Perforation | 345.00 | 347.00 | 20 |
| 2016-01-20 | Remedial Casing Cementing | 345.00 | 347.00 | 0 |
| 2016-01-20 | Packing Device Capped w/Cement | 316.80 | 336.00 | 0 |
| 2016-10-04 | Perforation | 286.50 | 287.80 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 2302 | 0.0 | 0.0 | 0.0 |
| 2012 | 5437 | 0.0 | 0.0 | 0.0 |
| 2013 | 5744 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-11-01 | No Incident Encountered | 0.00 | 0.00 |
| 2015-09-30 | No Incident Encountered | 0.00 | 0.00 |
| 2016-01-21 | No Incident Encountered | 0.00 | 0.00 |
| 2016-10-07 | No Incident Encountered | 0.00 | 0.00 |
| 2017-06-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]