X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504041616002

Well Details

Well ID: 0504041616002
Loading map...
Location: 00/16-16-050-04W4/2
Location Alias: 00/16-16-50-04 W4M
Location Alias 2: 00/16-16-050-04 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 04
Section: 16
County/Municipality: County of Vermilion River
Well Name: GEAR 16D LLOYD 16-16-50-4
Operator Name: Gear Energy Ltd.
License Number: 0434097
License Date: 2011-06-06
License Status: Suspension
Spud Date: 2011-08-02
Final Drill Date: 2011-08-08
Well Total Depth: 1185.50 m
Surface Hole Latitude: 53.320814
Surface Hole Longitude: -110.508079

For data sources see[1][2]

Well History

Date Event
2011-06-06 Obtained License
2011-08-03 Direction Drilling Operation Performed - Deviate
2011-08-03 Surface Casing Operation Performed
2011-08-06 Well Log Performed
2011-08-07 Production Casing Operation Performed
2011-08-08 Finished Drilling
2011-08-08 Rig Released
2011-08-08 Well Mode changed to Drilled and Cased
2011-12-21 Perforation Treatment Performed - Jet Perforation
2011-12-21 Well Log Performed
2014-12-31 Perforation Treatment Performed - Jet Perforation
2015-01-02 Well Began Production
2015-01-02 Well Fluid changed to Crude Oil
2015-01-02 Well Mode changed to Pumping
2016-02-01 Well Fluid changed to Crude Oil
2016-02-01 Well Mode changed to Suspended
2018-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-16 Plug Back Performed
2018-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-26 Perforation Treatment Performed - Jet Perforation
2018-10-26 Plug Back Performed
2018-10-26 Well Fluid changed to Crude Oil
2018-10-26 Well Mode changed to Abandoned Zone
2018-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-29 Perforation Treatment Performed - Cement Squeeze
2018-10-29 Plug Back Performed
2018-10-31 Perforation Treatment Performed - Jet Perforation
2018-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-01 Perforation Treatment Performed - Cement Squeeze
2018-11-01 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-03 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-21 Perforation 1101.00 1104.00 26
2018-11-01 Packing Device Capped w/Cement 201.00 209.00 0
2014-12-31 Perforation 1018.00 1022.50 26
2018-10-16 Packing Device Capped w/Cement 1079.00 1087.00 0
2018-10-26 Packing Device Capped w/Cement 997.00 1005.00 0
2018-10-26 Perforation 291.00 292.00 20
2018-10-29 Packing Device Capped w/Cement 281.00 289.00 0
2018-10-29 Cement Squeeze 291.00 292.00 0
2018-10-31 Perforation 212.00 213.00 20
2018-11-01 Cement Squeeze 212.00 213.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 432 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-30 No Incident Encountered 0.00 0.00
2015-01-02 No Incident Encountered 0.00 0.00
2018-11-01 No Incident Encountered 0.00 0.00
2018-10-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References