If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504032803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.339677,"lon":-110.388035,"icon":""}]} |
Location: 00/03-28-050-03W4/0 | |
Location Alias: 00/03-28-50-03 W4M | |
Location Alias 2: 00/03-28-050-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 03 | |
Section: 28 | |
County/Municipality: County of Vermilion River | |
Well Name: PROVIDENT ET AL LLOYD 3-28-50-3 | |
Operator Name: Pembina NGL Corporation | |
License Number: 0113609 | |
License Date: 1985-02-26 | |
License Status: RecCertified | |
Spud Date: 1985-03-16 | |
Final Drill Date: 1985-03-18 | |
Well Total Depth: 721.00 m | |
Surface Hole Latitude: 53.339677 | |
Surface Hole Longitude: -110.388035 |
Date | Event |
---|---|
1985-02-26 | Obtained License |
1985-03-16 | Surface Casing Operation Performed |
1985-03-18 | Finished Drilling |
1985-03-18 | Well Mode changed to Drilled and Cased |
1985-03-19 | Production Casing Operation Performed |
1985-03-19 | Rig Released |
1985-03-19 | Well Log Performed |
1985-05-14 | Well Began Production |
1985-05-14 | Well Fluid changed to Crude Oil |
1985-05-14 | Well Mode changed to Pumping |
1985-05-21 | Perforation Treatment Performed - Jet Perforation |
1987-08-27 | Perforation Treatment Performed - Cement Squeeze |
1987-08-31 | Perforation Treatment Performed - Jet Perforation |
1993-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-09-05 | Plug Back Performed |
1993-09-05 | Well Fluid changed to Crude Oil |
1993-09-05 | Well Mode changed to Abandoned |
1993-09-17 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-05-21 | Perforation | 603.00 | 604.00 | 14 |
1987-08-27 | Cement Squeeze | 603.00 | 604.00 | 0 |
1987-08-31 | Perforation | 599.00 | 600.00 | 13 |
1993-09-05 | Packing Device Capped w/Cement | 582.00 | 590.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 5328 | 0.0 | 0.0 | 0.0 |
1986 | 4968 | 0.0 | 0.0 | 0.0 |
1987 | 6623 | 0.0 | 0.0 | 0.0 |
1988 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]