If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504023607B20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.354897,"lon":-110.16322,"icon":""}]} |
| Location: B2/07-36-050-02W4/0 | |
| Location Alias: B2/07-36-50-02 W4M | |
| Location Alias 2: B2/07-36-050-02 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 36 | |
| County/Municipality: County of Vermilion River | |
| Well Name: CNRL 7B2 LLOYD 7-36-50-2 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0099325 | |
| License Date: 1982-11-29 | |
| License Status: Abandoned | |
| Spud Date: 1982-12-03 | |
| Final Drill Date: 1982-12-04 | |
| Well Total Depth: 625.00 m | |
| Surface Hole Latitude: 53.354897 | |
| Surface Hole Longitude: -110.163220 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1982-11-29 | Obtained License |
| 1982-12-04 | Finished Drilling |
| 1982-12-04 | Well Mode changed to Drilled and Cased |
| 1982-12-06 | Production Casing Operation Performed |
| 1983-01-19 | Perforation Treatment Performed - Jet Perforation |
| 1983-01-20 | Well Began Production |
| 1983-01-20 | Well Fluid changed to Crude Oil |
| 1983-01-20 | Well Mode changed to Pumping |
| 1984-07-23 | Well Log Performed |
| 1984-07-24 | Perforation Treatment Performed - Cement Squeeze |
| 1984-07-24 | Plug Back Performed |
| 1984-07-24 | Well Fluid changed to Crude Oil |
| 1984-07-24 | Well Mode changed to Abandoned Zone |
| 1984-07-26 | Perforation Treatment Performed - Jet Perforation |
| 1990-10-12 | Perforation Treatment Performed - Jet Perforation |
| 2010-06-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-06-26 | Plug Back Performed |
| 2010-08-23 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1983-01-19 | Perforation | 598.00 | 601.00 | 13 |
| 1984-07-24 | Cement Squeeze | 598.00 | 601.00 | 0 |
| 1984-07-26 | Perforation | 586.00 | 590.00 | 13 |
| 1990-10-12 | Perforation | 582.00 | 585.00 | 26 |
| 1990-10-12 | Perforation | 586.00 | 589.00 | 13 |
| 2010-06-26 | Packing Device Capped w/Cement | 572.00 | 580.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1983 | 7862 | 0.0 | 0.0 | 0.0 |
| 1984 | 4895 | 0.0 | 0.0 | 0.0 |
For data sources see[5]