If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504023507C02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.357451,"lon":-110.186878,"icon":""}]} |
| Location: C0/07-35-050-02W4/2 | |
| Location Alias: C0/07-35-50-02 W4M | |
| Location Alias 2: C0/07-35-050-02 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 35 | |
| County/Municipality: County of Vermilion River | |
| Well Name: CNRL 7C LLOYD 7-35-50-2 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0069964 | |
| License Date: 1978-06-06 | |
| License Status: Suspension | |
| Spud Date: 1978-06-23 | |
| Final Drill Date: 1978-06-26 | |
| Well Total Depth: 620.00 m | |
| Surface Hole Latitude: 53.357451 | |
| Surface Hole Longitude: -110.186878 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1978-06-06 | Obtained License |
| 1978-06-26 | Finished Drilling |
| 1978-06-26 | Production Casing Operation Performed |
| 1978-06-26 | Well Mode changed to Drilled and Cased |
| 1978-07-24 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-10-28 | Plug Back Performed |
| 1993-10-29 | Perforation Treatment Performed - Jet Perforation |
| 1993-12-01 | Well Began Production |
| 1993-12-01 | Well Fluid changed to Gas |
| 1993-12-01 | Well Mode changed to Flowing |
| 2001-08-31 | Well Fluid changed to Gas |
| 2001-08-31 | Well Mode changed to Suspended |
| 2011-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1978-07-24 | Perforation | 573.00 | 576.10 | 13 |
| 1978-07-24 | Perforation | 579.10 | 584.00 | 13 |
| 1993-10-28 | Packing Device Capped w/Cement | 558.00 | 566.00 | 0 |
| 1993-10-29 | Perforation | 529.00 | 530.00 | 13 |
| 1993-10-29 | Perforation | 531.00 | 532.00 | 13 |
| 2011-11-01 | Packing Device Capped w/Cement | 519.00 | 527.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1993 | 742 | 0.0 | 0.0 | 0.0 |
| 1994 | 8674 | 0.0 | 0.0 | 0.0 |
| 1995 | 8189 | 0.0 | 0.0 | 0.0 |
| 1996 | 3441 | 0.0 | 0.0 | 0.0 |
| 1997 | 5081 | 0.0 | 0.0 | 0.0 |
| 1998 | 2730 | 0.0 | 0.0 | 0.0 |
| 1999 | 193 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2011-11-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]