X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504022503A00

Well Details

Well ID: 0504022503A00
Loading map...
Location: A0/03-25-050-02W4/0
Location Alias: A0/03-25-50-02 W4M
Location Alias 2: A0/03-25-050-02 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 02
Section: 25
County/Municipality: County of Vermilion River
Well Name: CNRL 3A LLOYD 3-25-50-2
Operator Name: Canadian Natural Resources Limited
License Number: 0006830
License Date: 1953-07-30
License Status: Abandoned
Spud Date: 1953-08-11
Final Drill Date: 1953-08-16
Well Total Depth: 606.60 m
Surface Hole Latitude: 53.337287
Surface Hole Longitude: -110.165501

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-30 Obtained License
1953-08-16 Finished Drilling
1953-08-16 Production Casing Operation Performed
1953-08-16 Well Mode changed to Drilled and Cased
1953-09-10 Perforation Treatment Performed - Bullet Perforation
1953-10-04 Well Began Production
1953-10-04 Well Fluid changed to Crude Oil
1953-10-04 Well Mode changed to Pumping
1954-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-01-31 Perforation Treatment Performed - Bullet Perforation
1959-04-21 Well Fluid changed to Crude Oil
1959-04-21 Well Mode changed to Suspended
1960-02-09 Well Fluid changed to Crude Oil
1960-02-09 Well Mode changed to Pumping
1968-10-22 Well Fluid changed to Crude Oil
1968-10-22 Well Mode changed to Suspended
1970-09-01 Well Fluid changed to Crude Oil
1970-09-01 Well Mode changed to Pumping
1992-03-01 Well Fluid changed to Crude Oil
1992-03-01 Well Mode changed to Suspended
1993-06-01 Well Began Injection
1993-06-01 Well Fluid changed to Water
1993-06-01 Well Type changed to Disposal
1993-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-11 Perforation Treatment Performed - Jet Perforation
1993-08-11 Plug Back Performed
1993-08-11 Well Log Performed
1993-08-13 Perforation Treatment Performed - Remedial Casing
1993-08-13 Well Fluid changed to Water
1993-08-13 Well Mode changed to Abandoned
1993-08-13 Well Type changed to Disposal
1993-09-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-10 Bullet Perforation 594.40 595.90 7
1954-01-31 Packing Device Capped w/Cement 591.90 591.90 0
1954-01-31 Bullet Perforation 581.90 584.00 16
1993-08-11 Packing Device Capped w/Cement 562.00 570.00 0
1993-08-11 Perforation 164.00 165.00 13
1993-08-13 Remedial Casing Cementing 164.00 165.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1970 2688 0.0 0.0 0.0
1971 7767 0.0 0.0 0.0
1972 8517 0.0 0.0 0.0
1973 8267 0.0 0.0 0.0
1974 4914 0.0 0.0 0.0
1975 8594 0.0 0.0 0.0
1976 7882 0.0 0.0 0.0
1977 7948 0.0 0.0 0.0
1978 8566 0.0 0.0 0.0
1979 8754 0.0 0.0 0.0
1980 8633 0.0 0.0 0.0
1981 8568 0.0 0.0 0.0
1982 8720 0.0 0.0 0.0
1983 8617 0.0 0.0 0.0
1984 8769 0.0 0.0 0.0
1985 8154 0.0 0.0 0.0
1986 8729 0.0 0.0 0.0
1987 8723 0.0 0.0 0.0
1988 5999 0.0 0.0 0.0
1989 6763 0.0 0.0 0.0
1990 8759 0.0 0.0 0.0
1991 8712 0.0 0.0 0.0
1992 1056 0.0 0.0 0.0

For data sources see[5]

References