If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504022003A02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.322608,"lon":-110.262805,"icon":""}]} |
| Location: A0/03-20-050-02W4/2 | |
| Location Alias: A0/03-20-50-02 W4M | |
| Location Alias 2: A0/03-20-050-02 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 20 | |
| County/Municipality: County of Vermilion River | |
| Well Name: PETROCAPITA LLOYD 3-20-50-2 | |
| Operator Name: Petrocapita GP I Ltd. | |
| License Number: 0410118 | |
| License Date: 2009-04-14 | |
| License Status: Issued | |
| Spud Date: 2009-06-02 | |
| Final Drill Date: 2009-06-05 | |
| Well Total Depth: 634.00 m | |
| Surface Hole Latitude: 53.322608 | |
| Surface Hole Longitude: -110.262805 |
| Date | Event |
|---|---|
| 2009-04-14 | Obtained License |
| 2009-06-05 | Finished Drilling |
| 2009-06-05 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-05 | Well Mode changed to Drilled and Cased |
| 2009-06-07 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-07 | Rig Released |
| 2009-06-08 | Well Began Production |
| 2009-06-08 | Well Fluid changed to Crude Oil |
| 2009-06-08 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-06-05 | Perforation | 613.30 | 614.50 | 13 |
| 2009-06-07 | Perforation | 613.30 | 617.70 | 26 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 4615 | 0.0 | 0.0 | 0.0 |
| 2010 | 8066 | 0.0 | 0.0 | 0.0 |
| 2011 | 8668 | 0.0 | 0.0 | 0.0 |
| 2012 | 8576 | 0.0 | 0.0 | 0.0 |
| 2013 | 7841 | 0.0 | 0.0 | 0.0 |
| 2014 | 8466 | 0.0 | 0.0 | 0.0 |
| 2015 | 8546 | 0.0 | 0.0 | 0.0 |
| 2016 | 7826 | 0.0 | 0.0 | 0.0 |
| 2017 | 8567 | 0.0 | 0.0 | 0.0 |
| 2018 | 7367 | 0.0 | 0.0 | 0.0 |
| 2019 | 754 | 0.0 | 0.0 | 0.0 |
For data sources see[5]