X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504021206AB2

Well Details

Well ID: 0504021206AB2
Loading map...
Location: AB/06-12-050-02W4/2
Location Alias: AB/06-12-50-02 W4M
Location Alias 2: AB/06-12-050-02 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 02
Section: 12
County/Municipality: County of Vermilion River
Well Name: TULCAN PETRO 12 LLOYD EX 6-12-50-2
Operator Name: Canadian Natural Resources Limited
License Number: 0038790
License Date: 1970-09-15
License Status: RecCertified
Spud Date: 1970-10-05
Final Drill Date: 1970-10-06
Well Total Depth: 616.30 m
Surface Hole Latitude: 53.298926
Surface Hole Longitude: -110.168509

For data sources see[1][2]

Well History

Date Event
1970-09-15 Obtained License
1970-10-06 Finished Drilling
1970-10-06 Perforation Treatment Performed - Bullet Perforation
1970-10-06 Perforation Treatment Performed - Selective Bullet Perforations
1970-10-06 Well Mode changed to Drilled and Cased
1971-07-01 Well Began Production
1971-07-01 Well Fluid changed to Crude Oil
1971-07-01 Well Mode changed to Pumping
1971-07-31 Well Fluid changed to Crude Oil
1971-07-31 Well Mode changed to Suspended
1992-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-20 Plug Back Performed
1992-03-10 Perforation Treatment Performed - Jet Perforation
1992-03-19 Perforation Treatment Performed - Remedial Casing
1992-03-19 Well Fluid changed to Crude Oil
1992-03-19 Well Mode changed to Abandoned
1992-03-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-10-06 Selective Bullet Perforations 597.10 608.40 0
1970-10-06 Bullet Perforation 604.40 605.60 13
1970-10-06 Bullet Perforation 604.10 605.00 20
1970-10-06 Bullet Perforation 599.80 602.00 20
1970-10-06 Selective Bullet Perforations 603.20 603.50 0
1970-10-06 Selective Bullet Perforations 607.20 607.20 0
1992-02-20 Packing Device Capped w/Cement 576.50 584.50 0
1992-03-10 Perforation 156.00 156.50 13
1992-03-19 Remedial Casing Cementing 156.00 156.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 744 0.0 0.0 0.0

For data sources see[5]

References