If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504021010C20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.302547,"lon":-110.211298,"icon":""}]} |
Location: C2/10-10-050-02W4/0 | |
Location Alias: C2/10-10-50-02 W4M | |
Location Alias 2: C2/10-10-050-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 02 | |
Section: 10 | |
County/Municipality: County of Vermilion River | |
Well Name: MURPHY LLOYD 10C-10-50-2 | |
Operator Name: Murphy Oil Company Ltd. | |
License Number: 0071561 | |
License Date: 1978-08-23 | |
License Status: RecCertified | |
Spud Date: 1978-10-11 | |
Final Drill Date: 1978-10-12 | |
Well Total Depth: 650.00 m | |
Surface Hole Latitude: 53.302547 | |
Surface Hole Longitude: -110.211298 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-08-23 | Obtained License |
1978-10-12 | Finished Drilling |
1978-10-12 | Well Mode changed to Drilled and Cased |
1978-10-13 | Production Casing Operation Performed |
1978-11-14 | Perforation Treatment Performed - Jet Perforation |
1978-11-24 | Well Began Production |
1978-11-24 | Well Fluid changed to Crude Oil |
1978-11-24 | Well Mode changed to Pumping |
1981-03-01 | Well Fluid changed to Crude Oil |
1981-03-01 | Well Mode changed to Suspended |
1982-11-09 | Perforation Treatment Performed - Jet Perforation |
1982-11-10 | Well Fluid changed to Crude Oil |
1982-11-10 | Well Mode changed to Pumping |
1984-12-11 | Well Fluid changed to Crude Oil |
1984-12-11 | Well Mode changed to Suspended |
1992-08-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-08-01 | Plug Back Performed |
1992-08-01 | Well Abandoned |
1992-08-01 | Well Fluid changed to Crude Oil |
1992-08-01 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-11-14 | Perforation | 612.80 | 615.00 | 13 |
1982-11-09 | Perforation | 613.00 | 616.00 | 0 |
1992-08-01 | Packing Device Capped w/Cement | 600.00 | 607.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 6888 | 0.0 | 0.0 | 0.0 |
1980 | 6119 | 0.0 | 0.0 | 0.0 |
1981 | 72 | 0.0 | 0.0 | 0.0 |
1983 | 342 | 0.0 | 0.0 | 0.0 |
1984 | 3624 | 0.0 | 0.0 | 0.0 |
For data sources see[5]