X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504013609002

Well Details

Well ID: 0504013609002
Loading map...
Location: 00/09-36-050-01W4/2
Location Alias: 00/09-36-50-01 W4M
Location Alias 2: 00/09-36-050-01 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 36
County/Municipality: County of Vermilion River
Well Name: KAIROS LLOYD 9-36-50-1
Operator Name: Kairos Resources (2011) Ltd.
License Number: 0119991
License Date: 1985-12-03
License Status: Abandoned
Spud Date: 1985-12-07
Final Drill Date: 1985-12-10
Well Total Depth: 625.00 m
Surface Hole Latitude: 53.361740
Surface Hole Longitude: -110.008837

For data sources see[1][2]

Well History

Date Event
1985-12-03 Obtained License
1985-12-08 Surface Casing Operation Performed
1985-12-10 Finished Drilling
1985-12-10 Well Log Performed
1985-12-10 Well Mode changed to Drilled and Cased
1985-12-11 Drill Stem Test Performed
1985-12-13 Production Casing Operation Performed
1985-12-13 Rig Released
1985-12-16 Well Log Performed
1985-12-21 Perforation Treatment Performed - Jet Perforation
1985-12-21 Well Log Performed
1986-11-07 Perforation Treatment Performed - Casing Patch (Over Perfs)
1986-11-09 Perforation Treatment Performed - Jet Perforation
1986-11-09 Well Log Performed
1986-11-10 Perforation Treatment Performed - Remedial Casing
1986-11-19 Perforation Treatment Performed - Jet Perforation
1986-11-19 Well Log Performed
1986-11-24 Well Began Production
1986-11-24 Well Fluid changed to Crude Oil
1986-11-24 Well Mode changed to Pumping
2000-10-19 Well Fluid changed to Crude Oil
2000-10-19 Well Mode changed to Suspended
2000-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-06 Perforation Treatment Performed - Jet Perforation
2000-12-06 Plug Back Performed
2000-12-06 Well Fluid changed to Crude Oil
2000-12-06 Well Log Performed
2000-12-06 Well Mode changed to Abandoned Zone
2011-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-31 Plug Back Performed
2011-09-12 Well Fluid changed to Crude Oil
2011-09-12 Well Mode changed to Abandoned
2018-10-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-21 Perforation 491.80 493.80 39
1986-11-07 Casing Patch 491.80 493.80 0
1986-11-09 Perforation 493.50 493.80 13
1986-11-10 Remedial Casing Cementing 493.50 493.80 0
1986-11-19 Perforation 539.50 542.50 13
2000-12-06 Perforation 492.00 494.00 26
2000-12-06 Packing Device Capped w/Cement 524.60 532.60 0
2011-08-31 Packing Device Capped w/Cement 475.50 483.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 731 0.0 0.0 0.0
1987 8206 0.0 0.0 0.0
1988 8620 0.0 0.0 0.0
1989 8539 0.0 0.0 0.0
1990 6064 0.0 0.0 0.0
1991 5612 0.0 0.0 0.0
1992 3063 0.0 0.0 0.0
1993 6747 0.0 0.0 0.0
1994 720 0.0 0.0 0.0
1995 3948 0.0 0.0 0.0
1996 5652 0.0 0.0 0.0
1997 8328 0.0 0.0 0.0
1998 1944 0.0 0.0 0.0
1999 6037 0.0 0.0 0.0
2000 4727 0.0 0.0 0.0

For data sources see[5]

References