X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504012001A20

Well Details

Well ID: 0504012001A20
Loading map...
Location: A2/01-20-050-01W4/0
Location Alias: A2/01-20-50-01 W4M
Location Alias 2: A2/01-20-050-01 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 20
County/Municipality: County of Vermilion River
Well Name: CNRL COMMEIL 1A LLOYD 1-20-50-1
Operator Name: Canadian Natural Resources Limited
License Number: 0003016
License Date: 1951-06-12
License Status: RecCertified
Spud Date: 1951-06-14
Final Drill Date: 1951-06-22
Well Total Depth: 716.00 m
Surface Hole Latitude: 53.322863
Surface Hole Longitude: -110.104751

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-12 Obtained License
1951-06-22 Finished Drilling
1951-06-22 Perforation Treatment Performed - Open-Hole Completion
1951-06-22 Production Casing Operation Performed
1951-06-22 Well Mode changed to Drilled and Cased
1951-07-23 Well Began Injection
1951-07-23 Well Fluid changed to Water
1951-07-23 Well Type changed to Disposal
1971-09-07 Well Fluid changed to Water
1971-09-07 Well Mode changed to Suspended
1971-09-07 Well Type changed to Disposal
1974-08-01 Well Fluid changed to Water
1974-08-01 Well Type changed to Disposal
1993-03-26 Well Fluid changed to Water
1993-03-26 Well Mode changed to Suspended
1993-03-26 Well Type changed to Disposal
1993-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-07 Perforation Treatment Performed - Jet Perforation
1993-06-07 Plug Back Performed
1993-06-07 Well Log Performed
1993-06-21 Perforation Treatment Performed - Remedial Casing
1993-06-21 Well Fluid changed to Water
1993-06-21 Well Mode changed to Abandoned
1993-06-21 Well Type changed to Disposal
1993-07-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-06-22 Open Hole/Barefoot Completion 670.60 716.00 0
1993-06-07 Packing Device Capped w/Cement 652.00 660.00 0
1993-06-07 Perforation 91.00 91.50 13
1993-06-21 Remedial Casing Cementing 91.00 91.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0

For data sources see[5]

References