X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504011315A03

Well Details

Well ID: 0504011315A03
Loading map...
Location: A0/15-13-050-01W4/3
Location Alias: A0/15-13-50-01 W4M
Location Alias 2: A0/15-13-050-01 W4/03
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 13
County/Municipality: County of Vermilion River
Well Name: CNRL 15A LLOYD 15-13-50-1
Operator Name: Canadian Natural Resources Limited
License Number: 0050249
License Date: 1974-06-26
License Status: Abandoned
Spud Date: 1974-07-17
Final Drill Date: 1974-07-20
Well Total Depth: 591.30 m
Surface Hole Latitude: 53.318974
Surface Hole Longitude: -110.013185

For data sources see[1][2]

Well History

Date Event
1974-06-26 Obtained License
1974-07-20 Finished Drilling
1974-07-20 Perforation Treatment Performed - Jet Perforation
1974-07-20 Well Mode changed to Drilled and Cased
1976-09-17 Perforation Treatment Performed - Jet Perforation
1977-07-01 Well Began Injection
1977-07-01 Well Fluid changed to Water
1977-07-01 Well Type changed to Disposal
1977-07-21 Perforation Treatment Performed - Cement Squeeze
1977-07-25 Perforation Treatment Performed - Jet Perforation
1977-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-24 Perforation Treatment Performed - Jet Perforation
1992-03-01 Well Fluid changed to Water
1992-03-01 Well Mode changed to Suspended
1992-03-01 Well Type changed to Disposal
1993-09-15 Well Fluid changed to Water
1993-09-15 Well Type changed to Disposal
2004-10-04 Well Abandoned
2007-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-30 Plug Back Performed
2007-09-30 Well Fluid changed to Water
2007-09-30 Well Mode changed to Abandoned Zone
2007-09-30 Well Type changed to Disposal
2007-10-01 Well Log Performed
2007-10-02 Perforation Treatment Performed - Cement Plug
2007-10-02 Perforation Treatment Performed - Jet Perforation
2007-10-02 Perforation Treatment Performed - Remedial Casing
2007-10-02 Well Log Performed
2007-10-04 Well Fluid changed to Water
2007-10-04 Well Mode changed to Abandoned
2007-10-04 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-07-20 Perforation 564.50 565.70 7
2007-10-02 Remedial Casing Cementing 107.00 108.00 0
2007-10-02 Cement Plug 67.60 123.00 0
1976-09-17 Perforation 514.20 514.80 7
1977-07-21 Cement Squeeze 564.50 565.70 0
1977-07-25 Perforation 520.60 522.40 7
1977-07-26 Acid Treatment 520.60 522.40 0
1978-02-24 Perforation 524.20 527.30 13
2007-09-29 Packing Device Capped w/Cement 538.50 546.50 0
2007-09-30 Packing Device Capped w/Cement 494.40 517.00 0
2007-10-02 Perforation 107.00 108.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0

For data sources see[5]

References