X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504010608D00

Well Details

Well ID: 0504010608D00
Loading map...
Location: D0/08-06-050-01W4/0
Location Alias: D0/08-06-50-01 W4M
Location Alias 2: D0/08-06-050-01 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 06
County/Municipality: County of Vermilion River
Well Name: KODIAK LLOYD 8D-6-50-1
Operator Name: Murphy Oil Company Ltd.
License Number: 0010414
License Date: 1955-11-01
License Status: RecCertified
Spud Date: 1955-11-07
Final Drill Date: 1955-11-12
Well Total Depth: 896.40 m
Surface Hole Latitude: 53.283626
Surface Hole Longitude: -110.130128

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-11-01 Obtained License
1955-11-12 Finished Drilling
1955-11-12 Production Casing Operation Performed
1955-11-12 Well Mode changed to Drilled and Cased
1956-03-01 Perforation Treatment Performed - Jet Perforation
1956-03-02 Perforation Treatment Performed - Jet Perforation
1956-05-23 Perforation Treatment Performed - Cement Squeeze
1956-05-29 Perforation Treatment Performed - Cement Squeeze
1956-05-30 Perforation Treatment Performed - Open-Hole Completion
1956-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-06-21 Well Began Injection
1956-06-21 Well Fluid changed to Water
1956-06-21 Well Type changed to Disposal
1967-10-31 Well Fluid changed to Water
1967-10-31 Well Mode changed to Suspended
1967-10-31 Well Type changed to Disposal
1972-05-01 Well Fluid changed to Water
1972-05-01 Well Type changed to Disposal
1973-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-01-17 Well Fluid changed to Water
1973-01-17 Well Mode changed to Abandoned Zone
1973-01-17 Well Type changed to Disposal
1973-01-20 Perforation Treatment Performed - Jet Perforation
1973-03-19 Perforation Treatment Performed - Cement Squeeze
1973-03-21 Perforation Treatment Performed - Jet Perforation
1973-06-06 Perforation Treatment Performed - Jet Perforation
1994-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-04 Plug Back Performed
1994-11-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-03-01 Perforation 713.20 716.30 7
1973-01-20 Perforation 547.70 548.90 10
1973-01-20 Perforation 550.20 551.40 10
1973-03-19 Cement Squeeze 546.50 551.40 0
1973-03-21 Perforation 598.30 600.20 13
1973-06-06 Perforation 602.00 604.10 13
1994-11-04 Packing Device Capped w/Cement 575.00 583.00 0
1956-03-01 Perforation 706.20 708.10 7
1956-03-02 Perforation 674.80 676.70 7
1956-05-23 Cement Squeeze 674.80 716.30 0
1956-05-29 Cement Squeeze 674.80 676.70 0
1956-05-30 Open Hole/Barefoot Completion 727.90 896.40 0
1956-06-20 Acid Treatment 727.90 896.40 0
1973-01-17 Packing Device Capped w/Cement 609.30 609.60 0
1973-01-20 Perforation 546.50 547.10 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0

For data sources see[5]

References