X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504010602B00

Well Details

Well ID: 0504010602B00
Loading map...
Location: B0/02-06-050-01W4/0
Location Alias: B0/02-06-50-01 W4M
Location Alias 2: B0/02-06-050-01 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 06
County/Municipality: County of Vermilion River
Well Name: NUS LLOYD 2B-6-50-1
Operator Name: Northern Utilities (Sask.) Ltd.
License Number: 0009536
License Date: 1955-06-07
License Status: RecCertified
Spud Date: 1955-06-17
Final Drill Date: 1955-06-21
Well Total Depth: 690.40 m
Surface Hole Latitude: 53.279114
Surface Hole Longitude: -110.138161

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-06-07 Obtained License
1955-06-21 Finished Drilling
1955-06-21 Production Casing Operation Performed
1955-06-21 Well Mode changed to Drilled and Cased
1955-07-04 Perforation Treatment Performed - Bullet Perforation
1955-07-04 Perforation Treatment Performed - Jet Perforation
1955-07-06 Perforation Treatment Performed - Cement Plug
1955-07-20 Perforation Treatment Performed - Jet Perforation
1955-11-25 Well Began Production
1955-11-25 Well Fluid changed to Gas
1955-11-25 Well Mode changed to Flowing
1956-02-07 Well Fluid changed to Gas
1956-02-07 Well Mode changed to Suspended
1956-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-03-17 Perforation Treatment Performed - Bullet Perforation
1957-03-23 Perforation Treatment Performed - Cement Squeeze
1957-03-27 Perforation Treatment Performed - Jet Perforation
1957-04-05 Well Fluid changed to Gas
1957-04-05 Well Mode changed to Flowing
1961-09-20 Well Fluid changed to Gas
1961-09-20 Well Mode changed to Suspended
1966-07-18 Well Fluid changed to Gas
1966-07-18 Well Mode changed to Flowing
1966-10-29 Well Fluid changed to Crude Oil
1966-10-29 Well Mode changed to Pumping
1994-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-27 Plug Back Performed
1994-06-28 Perforation Treatment Performed - Jet Perforation
1994-06-28 Perforation Treatment Performed - Remedial Casing
1994-06-28 Well Abandoned
1994-06-28 Well Fluid changed to Crude Oil
1994-06-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-07-04 Perforation 635.50 637.00 7
1994-06-27 Packing Device Capped w/Cement 580.00 588.00 0
1994-06-28 Perforation 95.00 96.00 13
1994-06-28 Remedial Casing Cementing 95.00 96.00 0
1955-07-04 Bullet Perforation 641.00 641.90 16
1955-07-06 Cement Plug 621.80 690.40 0
1955-07-20 Perforation 595.60 596.80 13
1956-03-15 Packing Device Capped w/Cement 573.30 581.90 0
1956-03-17 Bullet Perforation 543.20 543.50 10
1956-03-17 Bullet Perforation 545.60 546.50 10
1957-03-23 Cement Squeeze 543.20 546.50 0
1957-03-27 Perforation 595.60 596.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 5496 0.0 0.0 0.0
1970 8759 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 8759 0.0 0.0 0.0
1974 8280 0.0 0.0 0.0
1975 8572 0.0 0.0 0.0
1976 7943 0.0 0.0 0.0
1977 7343 0.0 0.0 0.0
1978 7343 0.0 0.0 0.0
1979 8759 0.0 0.0 0.0
1980 8423 0.0 0.0 0.0
1981 8591 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 8495 0.0 0.0 0.0
1984 7631 0.0 0.0 0.0
1985 8111 0.0 0.0 0.0
1986 7200 0.0 0.0 0.0
1987 6840 0.0 0.0 0.0
1988 6768 0.0 0.0 0.0
1989 1488 0.0 0.0 0.0

For data sources see[5]

References