If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504010301A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.279121,"lon":-110.057438,"icon":""}]} |
Location: A0/01-03-050-01W4/0 | |
Location Alias: A0/01-03-50-01 W4M | |
Location Alias 2: A0/01-03-050-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 01 | |
Section: 03 | |
County/Municipality: Lloydminster | |
Well Name: KODIAK ROY AM ET AL LLOYD 1A-3-50-1 | |
Operator Name: Murphy Oil Company Ltd. | |
License Number: 0029971 | |
License Date: 1966-02-08 | |
License Status: RecCertified | |
Spud Date: 1966-02-14 | |
Final Drill Date: 1966-02-16 | |
Well Total Depth: 602.00 m | |
Surface Hole Latitude: 53.279121 | |
Surface Hole Longitude: -110.057438 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-02-08 | Obtained License |
1966-02-16 | Finished Drilling |
1966-02-16 | Production Casing Operation Performed |
1966-02-16 | Well Mode changed to Drilled and Cased |
1966-03-06 | Perforation Treatment Performed - Bullet Perforation |
1966-03-09 | Well Began Production |
1966-03-09 | Well Fluid changed to Crude Oil |
1966-03-09 | Well Mode changed to Pumping |
1988-07-01 | Well Fluid changed to Crude Oil |
1988-07-01 | Well Mode changed to Suspended |
1990-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-10-26 | Plug Back Performed |
1990-10-26 | Well Abandoned |
1990-10-26 | Well Fluid changed to Crude Oil |
1990-10-26 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-03-06 | Bullet Perforation | 581.60 | 583.40 | 13 |
1966-03-06 | Bullet Perforation | 585.80 | 587.70 | 13 |
1990-10-26 | Packing Device Capped w/Cement | 561.40 | 569.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1416 | 0.0 | 0.0 | 0.0 |
1969 | 7752 | 0.0 | 0.0 | 0.0 |
1970 | 7931 | 0.0 | 0.0 | 0.0 |
1971 | 5567 | 0.0 | 0.0 | 0.0 |
1972 | 8567 | 0.0 | 0.0 | 0.0 |
1973 | 8663 | 0.0 | 0.0 | 0.0 |
1974 | 4343 | 0.0 | 0.0 | 0.0 |
1975 | 504 | 0.0 | 0.0 | 0.0 |
1976 | 7631 | 0.0 | 0.0 | 0.0 |
1977 | 8615 | 0.0 | 0.0 | 0.0 |
1978 | 8759 | 0.0 | 0.0 | 0.0 |
1979 | 8423 | 0.0 | 0.0 | 0.0 |
1980 | 8663 | 0.0 | 0.0 | 0.0 |
1981 | 8759 | 0.0 | 0.0 | 0.0 |
1982 | 7343 | 0.0 | 0.0 | 0.0 |
1983 | 8759 | 0.0 | 0.0 | 0.0 |
1984 | 7703 | 0.0 | 0.0 | 0.0 |
1985 | 8639 | 0.0 | 0.0 | 0.0 |
1986 | 768 | 0.0 | 0.0 | 0.0 |
For data sources see[5]