X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495190408000

Well Details

Well ID: 0495190408000
Loading map...
Location: 00/08-04-049-19W5/0
Location Alias: 00/08-04-49-19 W5M
Location Alias 2: 00/08-04-049-19 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 19
Section: 04
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ MINEHEAD 8-4-49-19
Operator Name: Tourmaline Oil Corp.
License Number: 0493921
License Date: 2019-03-05
License Status: Amended
Spud Date: 2019-04-05
Final Drill Date: 2019-04-29
Well Total Depth: 4897.00 m
Surface Hole Latitude: 53.211923
Surface Hole Longitude: -116.718245

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-04-16 2957.40 Deviate (5 - 79 degrees)
2019-04-20 3555.40 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-07-27 Multi-Stage Fracture 4827.90 4828.00 0
2019-07-27 Multi-Stage Fracture 4367.20 4367.30 0
2019-07-27 Multi-Stage Fracture 4314.70 4314.80 0
2019-07-27 Multi-Stage Fracture 4262.20 4262.30 0
2019-07-27 Multi-Stage Fracture 4159.40 4159.50 0
2019-07-27 Multi-Stage Fracture 4082.10 4082.20 0
2019-07-27 Multi-Stage Fracture 4029.50 4029.60 0
2019-07-27 Multi-Stage Fracture 3977.00 3977.10 0
2019-07-27 Multi-Stage Fracture 3924.40 3924.50 0
2019-07-27 Multi-Stage Fracture 3871.90 3872.00 0
2019-07-27 Multi-Stage Fracture 3819.30 3819.40 0
2019-07-27 Multi-Stage Fracture 4786.40 4786.50 0
2019-07-27 Multi-Stage Fracture 3714.20 3714.30 0
2019-07-27 Multi-Stage Fracture 3661.70 3661.80 0
2019-07-27 Multi-Stage Fracture 3609.10 3609.20 0
2019-07-27 Multi-Stage Fracture 3556.60 3556.70 0
2019-07-27 Multi-Stage Fracture 3504.00 3504.10 0
2019-07-27 Multi-Stage Fracture 3452.30 3452.40 0
2019-07-27 Multi-Stage Fracture 3399.70 3399.80 0
2019-07-27 Multi-Stage Fracture 3347.10 3347.20 0
2019-07-27 Multi-Stage Fracture 3766.80 3766.90 0
2019-07-27 Multi-Stage Fracture 4733.90 4734.00 0
2019-07-27 Multi-Stage Fracture 4681.40 4681.50 0
2019-07-27 Multi-Stage Fracture 4628.90 4629.00 0
2019-07-27 Multi-Stage Fracture 4577.50 4577.60 0
2019-07-27 Multi-Stage Fracture 4524.90 4525.00 0
2019-07-27 Multi-Stage Fracture 4472.40 4472.50 0
2019-07-27 Multi-Stage Fracture 4419.80 4419.90 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-07-27 2019-07-27 3,235 6,257 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.9042 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.7779 N/A
silica crystalline 14808-60-7 100 3.7779 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.2409 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8889 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
polyethylene glycol 25322-68-3 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0892 N/A
water Not Available 100 0.0892 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0472 N/A
non-hazardous ingredients Not Available 100 0.0472 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0407 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0407 N/A
methanol 67-56-1 100 0.0407 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0407 N/A
non-hazardous ingredients Not Available 100 0.0407 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-07-21 2019-07-21 Municipal Water 90
2019-07-21 2019-07-22 Recycled Fracturing Water (treated at well site) 1864
2019-07-23 2019-07-25 Oilfield Produced Water 1015
2019-07-22 2019-07-26 Oilfield Produced Water 1324
2019-07-28 2019-08-02 Surface Water - River 1964

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3550 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-29 No Incident Encountered 0.00 0.00
2019-07-31 No Incident Encountered 0.00 0.00

For data sources see[8]

References